Triple

T20630758
Position Surface form Disambiguated ID Type / Status
Subject Orangery E506946 entity
Predicate instanceOf P0 FINISHED
Object greenhouse-type building C7922 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: greenhouse-type building
Context triple: [Orangery, instanceOf, greenhouse-type building]
  • A. greenhouse cultivation area
    A greenhouse cultivation area is a controlled environment structure where plants are grown under regulated conditions of light, temperature, humidity, and ventilation to optimize growth and productivity.
  • B. botanical garden building chosen
    A botanical garden building is a specialized structure designed to cultivate, display, and study diverse plant collections in controlled environments for education, conservation, and public enjoyment.
  • C. rooftop garden
    A rooftop garden is a cultivated green space installed on the roof of a building, typically used for growing plants, improving insulation, and enhancing urban environmental quality.
  • D. plantation outbuilding complex
    A plantation outbuilding complex is a clustered group of secondary structures—such as kitchens, slave quarters, barns, and workshops—supporting the agricultural, domestic, and industrial operations of a plantation.
  • E. greenhouse gallery
    A greenhouse gallery is a light-filled, climate-controlled space that combines plant cultivation with exhibition areas for art, design, or educational displays.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b4bd4a0081908d4e97a590a33fb2 completed April 16, 2026, 10:06 a.m.
Created at: April 16, 2026, 11:42 a.m.