Triple

T20603768
Position Surface form Disambiguated ID Type / Status
Subject Wagon Train E506248 entity
Predicate inspiredBy P9 FINISHED
Object Wagon Master NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Wagon Master | Statement: [Wagon Train, inspiredBy, Wagon Master]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Wagon Master
Context triple: [Wagon Train, inspiredBy, Wagon Master]
  • A. Wagon Master chosen
    Wagon Master is a 1950 Western film directed by John Ford that follows a group of Mormon settlers traveling by wagon train through the American frontier.
  • B. The Wagon
    "The Wagon" is a 1991 alternative rock song by Dinosaur Jr. known for its fuzzy guitar sound, melodic hooks, and status as one of the band’s signature tracks.
  • C. The Wagonmasters
    The Wagonmasters were the longtime backing band for country music star Porter Wagoner, known for supporting his performances on stage and television.
  • D. On the Wagon
    "On the Wagon" is a song by the alternative rock band Shenanigans.
  • E. The Railroader
    The Railroader is a film also known as Railroad Boy, likely centered on themes of railroads or railway life.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b4bb2b4081908fa4a72444120f35 completed April 16, 2026, 10:06 a.m.
NER Named-entity recognition batch_69e6aa22663881909a8d4644e1c48dc2 completed April 20, 2026, 10:35 p.m.
Created at: April 16, 2026, 11:41 a.m.