Triple

T20600054
Position Surface form Disambiguated ID Type / Status
Subject Clinton River E506151 entity
Predicate hasTributary P415 FINISHED
Object Clinton River Cutoff Canal NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Clinton River Cutoff Canal | Statement: [Clinton River, hasTributary, Clinton River Cutoff Canal]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Clinton River Cutoff Canal
Context triple: [Clinton River, hasTributary, Clinton River Cutoff Canal]
  • A. Crosscut Canal
    The Crosscut Canal is a historic waterway in the Phoenix, Arizona area that diverts and distributes irrigation water from the region’s main canal system to local agricultural and urban users.
  • B. Barkley Canal
    Barkley Canal is a man-made waterway in western Kentucky that links Kentucky Lake with Lake Barkley, enabling navigation between the two reservoirs.
  • C. Olene Gap Canal
    Olene Gap Canal is an irrigation waterway in southern Oregon that diverts flows from the Lost River to support regional agriculture.
  • D. Blackstone Canal
    The Blackstone Canal is a historic 19th-century waterway in the northeastern United States that played a key role in early industrial transportation and the development of mill towns in the Blackstone Valley.
  • E. Feeder Canal
    The Feeder Canal is an artificial waterway in Bristol, England, that connects the River Avon to Bristol Harbour and helps regulate water levels for the city’s docks.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Clinton River Cutoff Canal
Target entity description: The Clinton River Cutoff Canal is a man-made waterway in southeastern Michigan designed to redirect and manage the flow of the Clinton River for flood control and navigation.
  • A. Crosscut Canal
    The Crosscut Canal is a historic waterway in the Phoenix, Arizona area that diverts and distributes irrigation water from the region’s main canal system to local agricultural and urban users.
  • B. Barkley Canal
    Barkley Canal is a man-made waterway in western Kentucky that links Kentucky Lake with Lake Barkley, enabling navigation between the two reservoirs.
  • C. Olene Gap Canal
    Olene Gap Canal is an irrigation waterway in southern Oregon that diverts flows from the Lost River to support regional agriculture.
  • D. Blackstone Canal
    The Blackstone Canal is a historic 19th-century waterway in the northeastern United States that played a key role in early industrial transportation and the development of mill towns in the Blackstone Valley.
  • E. Feeder Canal
    The Feeder Canal is an artificial waterway in Bristol, England, that connects the River Avon to Bristol Harbour and helps regulate water levels for the city’s docks.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b4ba6ae88190af871e1f9522c704 completed April 16, 2026, 10:06 a.m.
NER Named-entity recognition batch_69e6aa1ef9ac8190b05e23c149529cb9 completed April 20, 2026, 10:35 p.m.
Created at: April 16, 2026, 11:41 a.m.