Triple

T2059310
Position Surface form Disambiguated ID Type / Status
Subject NCEES-approved Pearson VUE test centers E45750 entity
Predicate instanceOf P0 FINISHED
Object testing facility C7750 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: testing facility
Context triple: [NCEES-approved Pearson VUE test centers, instanceOf, testing facility]
  • A. maintenance facility
    A maintenance facility is a dedicated location equipped with tools, resources, and personnel for inspecting, repairing, and servicing equipment, vehicles, or infrastructure to ensure their proper functioning and longevity.
  • B. experimental area
    An experimental area is a designated space equipped and organized for conducting controlled tests, trials, or research activities under specified conditions.
  • C. research facility
    A research facility is a specialized institution equipped with laboratories, instruments, and resources where scientists and experts systematically investigate, experiment, and develop new knowledge or technologies.
  • D. flight simulation facility
    A flight simulation facility is a specialized environment equipped with advanced simulators and support systems that replicate real-world aircraft operations for pilot training, research, and systems testing.
  • E. practice facility
    A practice facility is a dedicated space equipped with specialized resources and environments where individuals or teams regularly train and refine their skills in a particular activity or discipline.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a8891a19508190a12ef1e192308dcb completed March 4, 2026, 7:33 p.m.
Created at: March 4, 2026, 7:40 p.m.