Triple

T20585053
Position Surface form Disambiguated ID Type / Status
Subject Clayton C. Anderson E505763 entity
Predicate notableWork P4 FINISHED
Object Space Shuttle mission STS-135 NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Space Shuttle mission STS-135 | Statement: [Clayton C. Anderson, notableWork, Space Shuttle mission STS-135]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Space Shuttle mission STS-135
Context triple: [Clayton C. Anderson, notableWork, Space Shuttle mission STS-135]
  • A. STS-135 chosen
    STS-135 was the final mission of NASA’s Space Shuttle program, flown by Atlantis in 2011 to resupply the International Space Station and conclude the shuttle era.
  • B. STS-133
    STS-133 was a 2011 NASA Space Shuttle mission that delivered supplies and the Permanent Multipurpose Module to the International Space Station as part of the final flights of the shuttle program.
  • C. Space Shuttle mission STS-67
    Space Shuttle mission STS-67 was a 1995 NASA flight of orbiter Endeavour focused on ultraviolet astronomy research using the ASTRO-2 observatory.
  • D. STS-125
    STS-125 was NASA’s final Space Shuttle servicing mission to upgrade and repair the Hubble Space Telescope, extending its scientific capabilities and operational life.
  • E. Space Shuttle mission STS-66
    Space Shuttle mission STS-66 was a 1994 NASA flight of orbiter Atlantis focused on studying Earth's atmosphere and climate using the ATLAS-3 and CRISTA-SPAS experiments.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b4b9669c8190b8e81fc72817d42c completed April 16, 2026, 10:06 a.m.
NER Named-entity recognition batch_69e6a975f098819083700593a9fa6cd0 completed April 20, 2026, 10:32 p.m.
Created at: April 16, 2026, 11:40 a.m.