Triple
T20585050
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Clayton C. Anderson |
E505763
|
entity |
| Predicate | notableWork |
P4
|
FINISHED |
| Object | Space Shuttle mission STS-117 |
—
|
NE NERFINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Space Shuttle mission STS-117 | Statement: [Clayton C. Anderson, notableWork, Space Shuttle mission STS-117]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Space Shuttle mission STS-117 Context triple: [Clayton C. Anderson, notableWork, Space Shuttle mission STS-117]
-
A.
STS-117
chosen
STS-117 was a 2007 Space Shuttle Atlantis mission to the International Space Station that delivered and installed the S3/S4 truss segment and solar arrays as part of the station’s assembly.
-
B.
Space Shuttle mission STS-102
Space Shuttle mission STS-102 was a 2001 NASA flight of Discovery that delivered and exchanged crew and supplies for the International Space Station as part of the early assembly and habitation phase.
-
C.
Space Shuttle mission STS-67
Space Shuttle mission STS-67 was a 1995 NASA flight of orbiter Endeavour focused on ultraviolet astronomy research using the ASTRO-2 observatory.
-
D.
STS-113
STS-113 was a NASA Space Shuttle Endeavour mission to the International Space Station in 2002 that delivered the P1 truss segment and rotated the station’s Expedition crew.
-
E.
STS-110
STS-110 was a 2002 Space Shuttle Atlantis mission to the International Space Station that delivered and installed the S0 truss segment, a key structural component of the station’s backbone.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e0b4b9669c8190b8e81fc72817d42c |
completed | April 16, 2026, 10:06 a.m. |
| NER | Named-entity recognition | batch_69e6a975f098819083700593a9fa6cd0 |
completed | April 20, 2026, 10:32 p.m. |
Created at: April 16, 2026, 11:40 a.m.