Triple

T20584310
Position Surface form Disambiguated ID Type / Status
Subject Salt Springs Reservoir E505743 entity
Predicate partOf P40 FINISHED
Object Mokelumne River Project NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Mokelumne River Project | Statement: [Salt Springs Reservoir, partOf, Mokelumne River Project]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Mokelumne River Project
Context triple: [Salt Springs Reservoir, partOf, Mokelumne River Project]
  • A. Mokelumne River Project chosen
    The Mokelumne River Project is a hydroelectric and water supply system on California’s Mokelumne River that includes dams, reservoirs, powerhouses, and associated facilities supporting regional water and energy needs.
  • B. Columbia Basin Project
    The Columbia Basin Project is a large-scale irrigation and hydroelectric development in central Washington State that distributes water and power from the Grand Coulee Dam to support agriculture, industry, and communities across the region.
  • C. Deschutes Project
    The Deschutes Project is a U.S. Bureau of Reclamation irrigation and water management development in central Oregon that supplies water for agriculture, municipalities, and wildlife habitat along the Deschutes River basin.
  • D. Klamath Project
    The Klamath Project is a major federal water management and irrigation system in southern Oregon and northern California that supplies water to agriculture, wildlife refuges, and communities in the Klamath Basin.
  • E. Feather River Project
    The Feather River Project is a major California water development and hydroelectric initiative centered on the Feather River watershed, providing water storage, power generation, and flood control for the state.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b4b9669c8190b8e81fc72817d42c completed April 16, 2026, 10:06 a.m.
NER Named-entity recognition batch_69e6a975f098819083700593a9fa6cd0 completed April 20, 2026, 10:32 p.m.
Created at: April 16, 2026, 11:40 a.m.