Triple

T20582526
Position Surface form Disambiguated ID Type / Status
Subject Dabaa E505695 entity
Predicate project P43804 FINISHED
Object El Dabaa Nuclear Power Plant NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: El Dabaa Nuclear Power Plant | Statement: [Dabaa, project, El Dabaa Nuclear Power Plant]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: El Dabaa Nuclear Power Plant
Context triple: [Dabaa, project, El Dabaa Nuclear Power Plant]
  • A. Dimona nuclear facility
    The Dimona nuclear facility is a highly secretive Israeli nuclear installation widely believed to be central to the country's undeclared nuclear weapons program.
  • B. Noor Power Station
    Noor Power Station is a large concentrated solar power complex near Ouarzazate, Morocco, and one of the world’s biggest solar power plants.
  • C. Osirak nuclear reactor
    The Osirak nuclear reactor was an Iraqi nuclear facility near Baghdad that became internationally known after being destroyed in a 1981 Israeli airstrike aimed at preventing Iraq from developing nuclear weapons.
  • D. Tihange nuclear power station
    Tihange nuclear power station is a major Belgian nuclear power plant on the Meuse River, known for its aging reactors and associated safety and political controversies.
  • E. Naharayim power plant
    The Naharayim power plant is a historic hydroelectric facility built in the 1930s at the confluence of the Jordan and Yarmouk rivers, once a major source of electricity for Mandatory Palestine and now a symbol of Israeli-Jordanian history and cooperation.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: El Dabaa Nuclear Power Plant
Target entity description: El Dabaa Nuclear Power Plant is Egypt’s first large-scale nuclear power station, being built on the Mediterranean coast with Russian assistance to generate electricity and diversify the country’s energy mix.
  • A. Dimona nuclear facility
    The Dimona nuclear facility is a highly secretive Israeli nuclear installation widely believed to be central to the country's undeclared nuclear weapons program.
  • B. Noor Power Station
    Noor Power Station is a large concentrated solar power complex near Ouarzazate, Morocco, and one of the world’s biggest solar power plants.
  • C. Osirak nuclear reactor
    The Osirak nuclear reactor was an Iraqi nuclear facility near Baghdad that became internationally known after being destroyed in a 1981 Israeli airstrike aimed at preventing Iraq from developing nuclear weapons.
  • D. Tihange nuclear power station
    Tihange nuclear power station is a major Belgian nuclear power plant on the Meuse River, known for its aging reactors and associated safety and political controversies.
  • E. Naharayim power plant
    The Naharayim power plant is a historic hydroelectric facility built in the 1930s at the confluence of the Jordan and Yarmouk rivers, once a major source of electricity for Mandatory Palestine and now a symbol of Israeli-Jordanian history and cooperation.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b4b9669c8190b8e81fc72817d42c completed April 16, 2026, 10:06 a.m.
NER Named-entity recognition batch_69e6a90f7e34819086b1745dcd53ba25 completed April 20, 2026, 10:30 p.m.
Created at: April 16, 2026, 11:40 a.m.