Triple
T20582327
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Ennerdale Link Bridges |
E505689
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | bridge structure |
C43293
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: bridge structure Context triple: [Ennerdale Link Bridges, instanceOf, bridge structure]
-
A.
beam bridge
A beam bridge is a simple type of bridge consisting of a horizontal beam supported at its ends by piers or abutments, carrying loads primarily through bending.
-
B.
river bridge
A river bridge is a structure built to span a river, providing a stable pathway for vehicles, pedestrians, or rail traffic to cross from one bank to the other.
-
C.
bridge operator
A bridge operator is an entity responsible for managing and controlling the operation, safety, and coordination of a bridge’s movable or functional components to ensure efficient and secure passage for users.
-
D.
suspension bridge
A suspension bridge is a type of bridge in which the deck is hung below large main cables that are anchored at each end and pass over tall towers, allowing it to span long distances.
-
E.
bridge anchorage structure
A bridge anchorage structure is a massive, stable foundation element that securely anchors the ends of bridge cables or tendons, transferring their tensile forces safely into the ground or supporting substructure.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e0b4b9669c8190b8e81fc72817d42c |
completed | April 16, 2026, 10:06 a.m. |
Created at: April 16, 2026, 11:40 a.m.