Triple
T20569885
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Oum Er-Rbia River |
E505065
|
entity |
| Predicate | hasHydroelectricPlant |
P15311
|
FINISHED |
| Object | Al Massira hydroelectric plant |
—
|
NE NERFINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Al Massira hydroelectric plant | Statement: [Oum Er-Rbia River, hasHydroelectricPlant, Al Massira hydroelectric plant]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Al Massira hydroelectric plant Context triple: [Oum Er-Rbia River, hasHydroelectricPlant, Al Massira hydroelectric plant]
-
A.
Bin el Ouidane hydroelectric plant
The Bin el Ouidane hydroelectric plant is a major Moroccan power station that harnesses the waters of the Oum Er-Rbia River to generate electricity and support regional water management.
-
B.
Shamaldy-Sai Hydroelectric Power Plant
The Shamaldy-Sai Hydroelectric Power Plant is a hydroelectric station in Kyrgyzstan that generates electricity using water flows regulated by the Toktogul Reservoir on the Naryn River.
-
C.
Haditha Hydroelectric Power Station
Haditha Hydroelectric Power Station is a major hydroelectric facility in Iraq that generates electricity using water from the Haditha Dam on the Euphrates River.
-
D.
Peligre hydroelectric plant
The Peligre hydroelectric plant is a major dam and power station in Haiti that provides a significant portion of the country’s electricity by harnessing the flow of the Artibonite River.
-
E.
Alfalfal hydroelectric plant
The Alfalfal hydroelectric plant is a power-generating facility in Chile that harnesses the flow of the Maipo River to produce electricity.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Al Massira hydroelectric plant Target entity description: Al Massira hydroelectric plant is a major Moroccan power station that generates electricity from the Al Massira Dam on the Oum Er-Rbia River.
-
A.
Bin el Ouidane hydroelectric plant
The Bin el Ouidane hydroelectric plant is a major Moroccan power station that harnesses the waters of the Oum Er-Rbia River to generate electricity and support regional water management.
-
B.
Shamaldy-Sai Hydroelectric Power Plant
The Shamaldy-Sai Hydroelectric Power Plant is a hydroelectric station in Kyrgyzstan that generates electricity using water flows regulated by the Toktogul Reservoir on the Naryn River.
-
C.
Haditha Hydroelectric Power Station
Haditha Hydroelectric Power Station is a major hydroelectric facility in Iraq that generates electricity using water from the Haditha Dam on the Euphrates River.
-
D.
Peligre hydroelectric plant
The Peligre hydroelectric plant is a major dam and power station in Haiti that provides a significant portion of the country’s electricity by harnessing the flow of the Artibonite River.
-
E.
Alfalfal hydroelectric plant
The Alfalfal hydroelectric plant is a power-generating facility in Chile that harnesses the flow of the Maipo River to produce electricity.
- F. None of above. chosen
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e0b4b721588190993ac7b0a9be2736 |
completed | April 16, 2026, 10:06 a.m. |
| NER | Named-entity recognition | batch_69e6a7a4b90c81909854dac72f671eec |
completed | April 20, 2026, 10:24 p.m. |
Created at: April 16, 2026, 11:39 a.m.