Triple
T20561568
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | General Dynamics European Land Systems |
E504853
|
entity |
| Predicate | notableProduct |
P1448
|
FINISHED |
| Object | M3 Amphibious Rig |
—
|
NE NERFINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: M3 Amphibious Rig | Statement: [General Dynamics European Land Systems, notableProduct, M3 Amphibious Rig]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: M3 Amphibious Rig Context triple: [General Dynamics European Land Systems, notableProduct, M3 Amphibious Rig]
-
A.
Assault Amphibious Vehicle
The Assault Amphibious Vehicle is a fully tracked, armored amphibious troop carrier used by the U.S. Marine Corps to transport Marines from ship to shore and in subsequent ground combat operations.
-
B.
FV103 Spartan
The FV103 Spartan is a British tracked armoured personnel carrier derived from the CVR(T) family, designed to transport small specialist teams on the battlefield.
-
C.
M728 Combat Engineer Vehicle
The M728 Combat Engineer Vehicle is a U.S. Army armored engineering vehicle based on the M60 tank chassis, equipped with a dozer blade, winch, and demolition gun for breaching, obstacle removal, and combat engineering tasks.
-
D.
M1132 Engineer Squad Vehicle
The M1132 Engineer Squad Vehicle is a Stryker-based armored combat support vehicle designed to transport combat engineers and provide mobility, countermobility, and survivability support on the battlefield.
-
E.
M88A1 armored recovery vehicle
The M88A1 armored recovery vehicle is a heavily armored, tracked support vehicle designed to recover, tow, and repair disabled tanks and other armored vehicles on the battlefield.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: M3 Amphibious Rig Target entity description: The M3 Amphibious Rig is a military engineering vehicle capable of rapidly deploying as a self-propelled ferry or bridge to transport armored units and other heavy equipment across water obstacles.
-
A.
Assault Amphibious Vehicle
The Assault Amphibious Vehicle is a fully tracked, armored amphibious troop carrier used by the U.S. Marine Corps to transport Marines from ship to shore and in subsequent ground combat operations.
-
B.
FV103 Spartan
The FV103 Spartan is a British tracked armoured personnel carrier derived from the CVR(T) family, designed to transport small specialist teams on the battlefield.
-
C.
M728 Combat Engineer Vehicle
The M728 Combat Engineer Vehicle is a U.S. Army armored engineering vehicle based on the M60 tank chassis, equipped with a dozer blade, winch, and demolition gun for breaching, obstacle removal, and combat engineering tasks.
-
D.
M1132 Engineer Squad Vehicle
The M1132 Engineer Squad Vehicle is a Stryker-based armored combat support vehicle designed to transport combat engineers and provide mobility, countermobility, and survivability support on the battlefield.
-
E.
M88A1 armored recovery vehicle
The M88A1 armored recovery vehicle is a heavily armored, tracked support vehicle designed to recover, tow, and repair disabled tanks and other armored vehicles on the battlefield.
- F. None of above. chosen
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e0b4b6587c8190aee63dc7cff244ea |
completed | April 16, 2026, 10:06 a.m. |
| NER | Named-entity recognition | batch_69e6a79ec10481909740eb6a08ae2658 |
completed | April 20, 2026, 10:24 p.m. |
Created at: April 16, 2026, 11:39 a.m.