Triple

T20544265
Position Surface form Disambiguated ID Type / Status
Subject Bikecentennial E504423 entity
Predicate notableWork P4 FINISHED
Object TransAmerica Bicycle Trail NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: TransAmerica Bicycle Trail | Statement: [Bikecentennial, notableWork, TransAmerica Bicycle Trail]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: TransAmerica Bicycle Trail
Context triple: [Bikecentennial, notableWork, TransAmerica Bicycle Trail]
  • A. Capital City State Trail
    The Capital City State Trail is a popular multi-use recreational path in and around Madison, Wisconsin, used for biking, walking, and commuting through urban and natural landscapes.
  • B. Rio Hondo Bike Path
    The Rio Hondo Bike Path is a paved multi-use trail in Los Angeles County that follows the Rio Hondo channel, providing cyclists and pedestrians with a scenic, off-street route connecting to the region’s larger river trail network.
  • C. Burlington Bike Path
    The Burlington Bike Path is a scenic multi-use recreational trail along the Lake Champlain waterfront in Burlington, Vermont, popular for cycling, walking, and running.
  • D. Central Valley Greenway
    Central Valley Greenway is a multi-use urban trail and cycling route in Metro Vancouver that connects several municipalities and natural areas, including parks and waterways.
  • E. Leon Creek Greenway
    Leon Creek Greenway is a multi-use recreational trail and natural corridor in San Antonio that offers walking, running, and cycling paths along the Leon Creek watershed.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: TransAmerica Bicycle Trail
Target entity description: The TransAmerica Bicycle Trail is a renowned cross-country cycling route spanning the United States, widely regarded as the classic long-distance bike touring route in North America.
  • A. Capital City State Trail
    The Capital City State Trail is a popular multi-use recreational path in and around Madison, Wisconsin, used for biking, walking, and commuting through urban and natural landscapes.
  • B. Rio Hondo Bike Path
    The Rio Hondo Bike Path is a paved multi-use trail in Los Angeles County that follows the Rio Hondo channel, providing cyclists and pedestrians with a scenic, off-street route connecting to the region’s larger river trail network.
  • C. Burlington Bike Path
    The Burlington Bike Path is a scenic multi-use recreational trail along the Lake Champlain waterfront in Burlington, Vermont, popular for cycling, walking, and running.
  • D. Central Valley Greenway
    Central Valley Greenway is a multi-use urban trail and cycling route in Metro Vancouver that connects several municipalities and natural areas, including parks and waterways.
  • E. Leon Creek Greenway
    Leon Creek Greenway is a multi-use recreational trail and natural corridor in San Antonio that offers walking, running, and cycling paths along the Leon Creek watershed.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b4b52c048190952b4d0f430813a3 completed April 16, 2026, 10:06 a.m.
NER Named-entity recognition batch_69e6a2957c308190aab81127f82f8aa6 completed April 20, 2026, 10:03 p.m.
Created at: April 16, 2026, 11:38 a.m.