Triple

T2054000
Position Surface form Disambiguated ID Type / Status
Subject STS-41-G E45631 entity
Predicate followedBy P78 FINISHED
Object STS-51-A E186836 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: STS-51-A | Statement: [STS-41-G, followedBy, STS-51-A]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: STS-51-A
Context triple: [STS-41-G, followedBy, STS-51-A]
  • A. STS-51-C
    STS-51-C was a 1985 classified U.S. Department of Defense Space Shuttle Discovery mission notable for being the first spaceflight of astronaut Ellison Onizuka.
  • B. STS-51A chosen
    STS-51A was a 1984 NASA Space Shuttle Discovery mission notable for successfully retrieving and returning two stranded communications satellites from orbit.
  • C. STS-51-L
    STS-51-L was the ill-fated 1986 Space Shuttle Challenger mission that ended in disaster shortly after launch, resulting in the loss of all seven crew members.
  • D. STS-51-G
    STS-51-G was a 1985 NASA Space Shuttle Discovery mission that deployed multiple communications satellites and conducted scientific experiments in low Earth orbit.
  • E. STS-41C
    STS-41C was a 1984 NASA Space Shuttle Challenger mission notable for successfully repairing the Solar Maximum Mission satellite during the first on-orbit satellite repair operation.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a8891a19508190a12ef1e192308dcb completed March 4, 2026, 7:33 p.m.
NER Named-entity recognition batch_69abb9a8518081909ba95a8ef9321f12 completed March 7, 2026, 5:37 a.m.
NED1 Entity disambiguation (via context triple) batch_69aeb3ae5cb48190bd6d1ed21f56fe2a completed March 9, 2026, 11:49 a.m.
Created at: March 4, 2026, 7:39 p.m.