Triple
T20530738
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | BNSF Seattle International Gateway |
E504059
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | intermodal rail yard |
C35874
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: intermodal rail yard Context triple: [BNSF Seattle International Gateway, instanceOf, intermodal rail yard]
-
A.
railroad classification yard
A railroad classification yard is a specialized rail facility where freight cars are sorted, assembled, and dispatched into new trains based on their destinations.
-
B.
intermodal passenger station
An intermodal passenger station is a transportation facility where travelers can conveniently transfer between multiple modes of passenger transport, such as trains, buses, trams, and sometimes air or ferry services, within a coordinated hub.
-
C.
railroad depot
A railroad depot is a facility where trains load and unload passengers or freight, typically including platforms, waiting areas, and operational offices.
-
D.
railroad facility
chosen
A railroad facility is a dedicated site or complex that supports the operation, maintenance, management, or interchange of trains and rail infrastructure.
-
E.
terminal railroad
A terminal railroad is a short-line or switching railroad that operates within a limited area, typically serving as an interchange point between major railroads and local industries, handling the transfer, classification, and delivery of freight cars.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e0b4b3a6e08190ae663701f50fab8e |
completed | April 16, 2026, 10:06 a.m. |
Created at: April 16, 2026, 11:37 a.m.