Triple

T20523666
Position Surface form Disambiguated ID Type / Status
Subject IEC Statutes and Rules of Procedure E503876 entity
Predicate appliesTo P1129 FINISHED
Object IEC subcommittees NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: IEC subcommittees | Statement: [IEC Statutes and Rules of Procedure, appliesTo, IEC subcommittees]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: IEC subcommittees
Context triple: [IEC Statutes and Rules of Procedure, appliesTo, IEC subcommittees]
  • A. IEC technical committee
    The IEC technical committee is a specialized group within the International Electrotechnical Commission responsible for developing and maintaining international standards in the electrotechnical and electronic fields.
  • B. IEC Advisory Committees
    IEC Advisory Committees are expert groups within the International Electrotechnical Commission that provide strategic and technical guidance on specialized areas of electrotechnical standardization.
  • C. IEC national committees
    IEC national committees are the national-level bodies that represent their countries in the International Electrotechnical Commission, coordinating and managing participation in global electrotechnical standardization.
  • D. IEC Standardization Management Board
    The IEC Standardization Management Board is the governing body within the International Electrotechnical Commission responsible for overseeing and coordinating its global electrotechnical standardization activities.
  • E. IEC Council
    The IEC Council is the high-level governing body of the International Electrotechnical Commission that oversees its strategic direction and overall organizational structure.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: IEC subcommittees
Target entity description: IEC subcommittees are specialized technical groups within the International Electrotechnical Commission that develop and maintain international standards in specific electrotechnical domains under the Commission’s formal governance framework.
  • A. IEC technical committee chosen
    The IEC technical committee is a specialized group within the International Electrotechnical Commission responsible for developing and maintaining international standards in the electrotechnical and electronic fields.
  • B. IEC Advisory Committees
    IEC Advisory Committees are expert groups within the International Electrotechnical Commission that provide strategic and technical guidance on specialized areas of electrotechnical standardization.
  • C. IEC national committees
    IEC national committees are the national-level bodies that represent their countries in the International Electrotechnical Commission, coordinating and managing participation in global electrotechnical standardization.
  • D. IEC Standardization Management Board
    The IEC Standardization Management Board is the governing body within the International Electrotechnical Commission responsible for overseeing and coordinating its global electrotechnical standardization activities.
  • E. IEC Council
    The IEC Council is the high-level governing body of the International Electrotechnical Commission that oversees its strategic direction and overall organizational structure.
  • F. None of above.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b4b3a6e08190ae663701f50fab8e completed April 16, 2026, 10:06 a.m.
NER Named-entity recognition batch_69e69f48691c8190af0ac959e92e10d9 completed April 20, 2026, 9:48 p.m.
Created at: April 16, 2026, 11:36 a.m.