Triple
T20506614
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Kentuck Knob |
E503449
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | Frank Lloyd Wright–designed house |
C25249
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: Frank Lloyd Wright–designed house Context triple: [Kentuck Knob, instanceOf, Frank Lloyd Wright–designed house]
-
A.
Case Study House
A Case Study House is a modernist residential prototype designed, often in mid-20th-century California, to experimentally explore innovative, affordable, and efficient postwar housing solutions.
-
B.
Bauhaus architect
A Bauhaus architect is a designer who integrates art, craft, and technology to create functional, minimalist buildings characterized by clean lines, geometric forms, and an emphasis on industrial materials and mass production.
-
C.
organic architecture
chosen
Organic architecture is a design philosophy that promotes harmony between human habitation and the natural world through forms, materials, and layouts that are inspired by and integrated with the surrounding environment.
-
D.
Art Deco architect
An Art Deco architect is a designer who creates buildings characterized by streamlined geometric forms, rich ornamentation, and modern materials that reflect the glamour and optimism of the early 20th century.
-
E.
Streamline Moderne building
A Streamline Moderne building is a late Art Deco architectural form characterized by smooth, curving surfaces, horizontal lines, nautical or aerodynamic motifs, and minimal ornamentation that evoke speed and modernity.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e0b4b1e52c8190894281cf7e3283ab |
completed | April 16, 2026, 10:06 a.m. |
Created at: April 16, 2026, 11:36 a.m.