Triple

T20488831
Position Surface form Disambiguated ID Type / Status
Subject Interstate 87 E502682 entity
Predicate hasJunctionWith P1018 FINISHED
Object Interstate 440 NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Interstate 440 | Statement: [Interstate 87, hasJunctionWith, Interstate 440]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Interstate 440
Context triple: [Interstate 87, hasJunctionWith, Interstate 440]
  • A. Interstate 440
    Interstate 440 is a beltway spur of Interstate 40 that forms part of the freeway loop around Little Rock, Arkansas, improving traffic flow and access to the city and its airport.
  • B. Interstate 440 chosen
    Interstate 440 is a beltway highway encircling much of Raleigh, North Carolina, providing a key route for regional traffic and access to the city’s major roads and neighborhoods.
  • C. Interstate 44
    Interstate 44 is a major east–west U.S. highway running from Texas through Oklahoma and Missouri to the St. Louis area, serving as a key transportation corridor in the central United States.
  • D. Interstate 55
    Interstate 55 is a major north–south U.S. highway running from Louisiana to Illinois, connecting cities such as New Orleans, Memphis, and Chicago.
  • E. Interstate 355
    Interstate 355 is a toll highway in the Chicago metropolitan area that serves as a suburban north–south bypass around the city.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b4b0373881909dd3e9387f82eab4 completed April 16, 2026, 10:06 a.m.
NER Named-entity recognition batch_69e69b5c6f84819087d813be3542ed33 completed April 20, 2026, 9:32 p.m.
Created at: April 16, 2026, 11:34 a.m.