Triple

T20484025
Position Surface form Disambiguated ID Type / Status
Subject Perris Valley extension E502537 entity
Predicate instanceOf P0 FINISHED
Object commuter rail line extension C43599 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: commuter rail line extension
Context triple: [Perris Valley extension, instanceOf, commuter rail line extension]
  • A. subway line extension
    A subway line extension is an added segment of track and stations that lengthens an existing subway route to serve new areas and increase transit capacity.
  • B. commuter rail line
    A commuter rail line is a passenger train service that operates on fixed tracks and schedules to connect suburban or outlying areas with a central city, primarily serving daily work and school commuters.
  • C. light rail expansion project
    A light rail expansion project is a coordinated planning, design, and construction effort to extend an existing light rail transit system’s routes, capacity, and supporting infrastructure to serve additional areas and riders.
  • D. commuter rail infrastructure
    Commuter rail infrastructure comprises the physical and operational systems—such as tracks, stations, signaling, power, and maintenance facilities—designed to support frequent, reliable passenger train service between suburbs and urban centers.
  • E. rapid transit expansion project
    A rapid transit expansion project is a coordinated planning, design, and construction effort to extend or enhance high-capacity public transportation networks to improve urban mobility and accommodate future demand.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b4af32848190aea80682b44d5d6e completed April 16, 2026, 10:06 a.m.
Created at: April 16, 2026, 11:34 a.m.