Triple

T20482579
Position Surface form Disambiguated ID Type / Status
Subject Connecticut Route 107 E502496 entity
Predicate partOf P40 FINISHED
Object Connecticut State Highway System NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Connecticut State Highway System | Statement: [Connecticut Route 107, partOf, Connecticut State Highway System]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Connecticut State Highway System
Context triple: [Connecticut Route 107, partOf, Connecticut State Highway System]
  • A. Connecticut Route 66
    Connecticut Route 66 is an east–west state highway in central and eastern Connecticut that connects several towns and cities, serving as a key regional arterial route.
  • B. Connecticut Turnpike
    The Connecticut Turnpike is a major toll-free highway corridor in Connecticut that forms part of Interstate 95 and serves as a primary route along the northeastern U.S. coast.
  • C. Connecticut Route 59
    Connecticut Route 59 is a state highway in southwestern Connecticut that connects several communities, including Easton, to the regional road network.
  • D. Connecticut Route 2
    Connecticut Route 2 is a primary east–west state highway in Connecticut that connects Hartford to southeastern parts of the state, serving as a key commuter and regional travel corridor.
  • E. Connecticut Route 3
    Connecticut Route 3 is a state highway in central Connecticut that connects the city of Middletown to the Greater Hartford area, including a major crossing of the Connecticut River via the Putnam Bridge.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Connecticut State Highway System
Target entity description: The Connecticut State Highway System is the network of state-maintained roads and routes that facilitates regional and local transportation throughout the state of Connecticut.
  • A. Connecticut Route 66
    Connecticut Route 66 is an east–west state highway in central and eastern Connecticut that connects several towns and cities, serving as a key regional arterial route.
  • B. Connecticut Turnpike
    The Connecticut Turnpike is a major toll-free highway corridor in Connecticut that forms part of Interstate 95 and serves as a primary route along the northeastern U.S. coast.
  • C. Connecticut Route 59
    Connecticut Route 59 is a state highway in southwestern Connecticut that connects several communities, including Easton, to the regional road network.
  • D. Connecticut Route 2
    Connecticut Route 2 is a primary east–west state highway in Connecticut that connects Hartford to southeastern parts of the state, serving as a key commuter and regional travel corridor.
  • E. Connecticut Route 3
    Connecticut Route 3 is a state highway in central Connecticut that connects the city of Middletown to the Greater Hartford area, including a major crossing of the Connecticut River via the Putnam Bridge.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b4af32848190aea80682b44d5d6e completed April 16, 2026, 10:06 a.m.
NER Named-entity recognition batch_69e69b57fa9c819091d12320d46a0cee completed April 20, 2026, 9:32 p.m.
Created at: April 16, 2026, 11:34 a.m.