Triple

T20461381
Position Surface form Disambiguated ID Type / Status
Subject Raccoon City E501930 entity
Predicate hasFacility P105 FINISHED
Object Incineration Disposal Plant P-12A NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Incineration Disposal Plant P-12A | Statement: [Raccoon City, hasFacility, Incineration Disposal Plant P-12A]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Incineration Disposal Plant P-12A
Context triple: [Raccoon City, hasFacility, Incineration Disposal Plant P-12A]
  • A. Tuas South Incineration Plant
    Tuas South Incineration Plant is a major waste-to-energy facility in Singapore that incinerates municipal solid waste to reduce landfill use while generating electricity.
  • B. Plant No. 112
    Plant No. 112 is the former name of the Krasnoye Sormovo Factory, a major Russian industrial enterprise known for shipbuilding and heavy machinery production.
  • C. New Taipei City Wugu Refuse Incineration Plant
    New Taipei City Wugu Refuse Incineration Plant is a major waste-to-energy facility in New Taipei City, Taiwan, that incinerates municipal solid waste while generating electricity.
  • D. Plant No. 23
    Plant No. 23 was a major Soviet-era aerospace manufacturing facility that later became known as the Khrunichev State Research and Production Space Center, a key producer of launch vehicles and space technology.
  • E. Nimbus Powerplant
    Nimbus Powerplant is a hydroelectric generating facility associated with California’s Nimbus Dam on the American River, producing renewable electricity from controlled water releases.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Incineration Disposal Plant P-12A
Target entity description: Incineration Disposal Plant P-12A is a waste-destruction facility in Raccoon City used to burn and dispose of hazardous biological and industrial materials.
  • A. Tuas South Incineration Plant
    Tuas South Incineration Plant is a major waste-to-energy facility in Singapore that incinerates municipal solid waste to reduce landfill use while generating electricity.
  • B. Plant No. 112
    Plant No. 112 is the former name of the Krasnoye Sormovo Factory, a major Russian industrial enterprise known for shipbuilding and heavy machinery production.
  • C. New Taipei City Wugu Refuse Incineration Plant
    New Taipei City Wugu Refuse Incineration Plant is a major waste-to-energy facility in New Taipei City, Taiwan, that incinerates municipal solid waste while generating electricity.
  • D. Plant No. 23
    Plant No. 23 was a major Soviet-era aerospace manufacturing facility that later became known as the Khrunichev State Research and Production Space Center, a key producer of launch vehicles and space technology.
  • E. Nimbus Powerplant
    Nimbus Powerplant is a hydroelectric generating facility associated with California’s Nimbus Dam on the American River, producing renewable electricity from controlled water releases.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b4ad4940819098cf2ff6413574e5 completed April 16, 2026, 10:06 a.m.
NER Named-entity recognition batch_69e696a642648190808709020f91122b completed April 20, 2026, 9:12 p.m.
Created at: April 16, 2026, 11:33 a.m.