Triple

T20457178
Position Surface form Disambiguated ID Type / Status
Subject Camanche Reservoir E501821 entity
Predicate createdBy P806 FINISHED
Object Camanche Dam NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Camanche Dam | Statement: [Camanche Reservoir, createdBy, Camanche Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Camanche Dam
Context triple: [Camanche Reservoir, createdBy, Camanche Dam]
  • A. Camanche Dam chosen
    Camanche Dam is a large earth-fill dam in California that creates Camanche Reservoir on the Mokelumne River for water storage, flood control, and recreation.
  • B. Del Valle Dam
    Del Valle Dam is a major earthfill dam in Alameda County, California, that creates Lake Del Valle for water storage, flood control, and recreation.
  • C. Escaba Dam
    Escaba Dam is a hydroelectric and irrigation dam located on the Salí River in Tucumán Province, Argentina.
  • D. Los Reyunos Dam
    Los Reyunos Dam is a hydroelectric and recreational reservoir complex in Mendoza Province, Argentina, known for its scenic canyon setting and water sports activities.
  • E. Colbún Dam
    Colbún Dam is a major hydroelectric dam in Chile that generates power from the Maule River and plays a key role in the country’s energy supply.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b4ad4940819098cf2ff6413574e5 completed April 16, 2026, 10:06 a.m.
NER Named-entity recognition batch_69e696a1b03c8190984d9db6d3251308 completed April 20, 2026, 9:12 p.m.
Created at: April 16, 2026, 11:32 a.m.