Triple
T20453718
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Anthony Proctor |
E501719
|
entity |
| Predicate | associatedWith |
P37
|
FINISHED |
| Object | AC-12 |
—
|
NE NERFINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: AC-12 | Statement: [Anthony Proctor, associatedWith, AC-12]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: AC-12 Context triple: [Anthony Proctor, associatedWith, AC-12]
-
A.
AC-12
AC-12 was the final and most advanced class of Southern Pacific’s Cab Forward articulated steam locomotives, renowned for their powerful performance in heavy freight service over mountainous terrain.
-
B.
AC-12
chosen
AC-12 is the fictional anti-corruption police unit at the center of the British television drama "Line of Duty," tasked with investigating misconduct within the force.
-
C.
AC-11
AC-11 was a class of Southern Pacific Railroad cab-forward articulated steam locomotives designed for heavy freight service over mountainous routes.
-
D.
AC-10
AC-10 was a class of Southern Pacific Railroad cab-forward articulated steam locomotives built for heavy freight service over mountainous routes.
-
E.
AC-5
AC-5 was a class of Southern Pacific Railroad cab-forward articulated steam locomotives built in the late 1920s for heavy freight service over mountainous routes.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e0b4ac0a1c81908845d0f8a56abce8 |
completed | April 16, 2026, 10:06 a.m. |
| NER | Named-entity recognition | batch_69e68d04ca4081909b428c31d16fca10 |
completed | April 20, 2026, 8:31 p.m. |
Created at: April 16, 2026, 11:32 a.m.