Triple

T20421921
Position Surface form Disambiguated ID Type / Status
Subject Viry-Châtillon station E500873 entity
Predicate servedBy P82 FINISHED
Object RER line D NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: RER line D | Statement: [Viry-Châtillon station, servedBy, RER line D]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: RER line D
Context triple: [Viry-Châtillon station, servedBy, RER line D]
  • A. RER line D chosen
    RER line D is one of the main lines of the Paris RER suburban rail network, running north–south through central Paris and serving numerous suburbs across the Île-de-France region.
  • B. RER line E
    RER line E is a Paris regional express railway line connecting central Paris with eastern suburbs such as Gagny.
  • C. RER B line
    The RER B line is a major Paris regional express railway line that connects central Paris with key northern and southern suburbs, including Charles de Gaulle Airport.
  • D. RER Line C
    RER Line C is a major commuter rail line in the Paris RER network, running along the Seine and serving numerous suburbs and key destinations in the Île-de-France region.
  • E. RER NG
    RER NG is a new-generation double-deck electric multiple unit train designed for Île-de-France’s RER network, offering higher capacity, improved accessibility, and enhanced passenger comfort.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b4aa68fc8190b1a14c55575ef04a completed April 16, 2026, 10:06 a.m.
NER Named-entity recognition batch_69e67ba52b7c8190bb358dbee994f580 completed April 20, 2026, 7:16 p.m.
Created at: April 16, 2026, 11:30 a.m.