Triple

T20418129
Position Surface form Disambiguated ID Type / Status
Subject Tampa Electric Company E500766 entity
Predicate hasPart P35 FINISHED
Object Big Bend Power Station NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Big Bend Power Station | Statement: [Tampa Electric Company, hasPart, Big Bend Power Station]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Big Bend Power Station
Context triple: [Tampa Electric Company, hasPart, Big Bend Power Station]
  • A. Barrett Chute Generating Station
    Barrett Chute Generating Station is a hydroelectric power facility located on the Madawaska River in Ontario, Canada.
  • B. McArthur Falls Generating Station
    McArthur Falls Generating Station is a hydroelectric power plant on the Winnipeg River in Manitoba, Canada, that generates electricity by harnessing the river’s flow.
  • C. Comanche Peak Nuclear Power Plant
    Comanche Peak Nuclear Power Plant is a commercial nuclear power generating facility in North Texas that supplies electricity to the region and is one of the state’s major nuclear power stations.
  • D. Little Long Generating Station
    Little Long Generating Station is a hydroelectric power plant located on the Mattagami River in northeastern Ontario, Canada, that contributes to the region’s electricity supply.
  • E. Fort Peck Power Plant
    Fort Peck Power Plant is a hydroelectric generating facility in Montana that converts water released from Fort Peck Dam into electrical power for the surrounding region.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Big Bend Power Station
Target entity description: Big Bend Power Station is a large coal-fired power plant in Apollo Beach, Florida, known for supplying electricity to the Tampa Bay area and for its nearby manatee viewing center.
  • A. Barrett Chute Generating Station
    Barrett Chute Generating Station is a hydroelectric power facility located on the Madawaska River in Ontario, Canada.
  • B. McArthur Falls Generating Station
    McArthur Falls Generating Station is a hydroelectric power plant on the Winnipeg River in Manitoba, Canada, that generates electricity by harnessing the river’s flow.
  • C. Comanche Peak Nuclear Power Plant
    Comanche Peak Nuclear Power Plant is a commercial nuclear power generating facility in North Texas that supplies electricity to the region and is one of the state’s major nuclear power stations.
  • D. Little Long Generating Station
    Little Long Generating Station is a hydroelectric power plant located on the Mattagami River in northeastern Ontario, Canada, that contributes to the region’s electricity supply.
  • E. Fort Peck Power Plant
    Fort Peck Power Plant is a hydroelectric generating facility in Montana that converts water released from Fort Peck Dam into electrical power for the surrounding region.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b4a935588190b9446a99b37ced44 completed April 16, 2026, 10:06 a.m.
NER Named-entity recognition batch_69e67a44ecf48190ba5a3872af500dc8 completed April 20, 2026, 7:11 p.m.
Created at: April 16, 2026, 11:30 a.m.