Triple
T20418129
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Tampa Electric Company |
E500766
|
entity |
| Predicate | hasPart |
P35
|
FINISHED |
| Object | Big Bend Power Station |
—
|
NE NERFINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Big Bend Power Station | Statement: [Tampa Electric Company, hasPart, Big Bend Power Station]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Big Bend Power Station Context triple: [Tampa Electric Company, hasPart, Big Bend Power Station]
-
A.
Barrett Chute Generating Station
Barrett Chute Generating Station is a hydroelectric power facility located on the Madawaska River in Ontario, Canada.
-
B.
McArthur Falls Generating Station
McArthur Falls Generating Station is a hydroelectric power plant on the Winnipeg River in Manitoba, Canada, that generates electricity by harnessing the river’s flow.
-
C.
Comanche Peak Nuclear Power Plant
Comanche Peak Nuclear Power Plant is a commercial nuclear power generating facility in North Texas that supplies electricity to the region and is one of the state’s major nuclear power stations.
-
D.
Little Long Generating Station
Little Long Generating Station is a hydroelectric power plant located on the Mattagami River in northeastern Ontario, Canada, that contributes to the region’s electricity supply.
-
E.
Fort Peck Power Plant
Fort Peck Power Plant is a hydroelectric generating facility in Montana that converts water released from Fort Peck Dam into electrical power for the surrounding region.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Big Bend Power Station Target entity description: Big Bend Power Station is a large coal-fired power plant in Apollo Beach, Florida, known for supplying electricity to the Tampa Bay area and for its nearby manatee viewing center.
-
A.
Barrett Chute Generating Station
Barrett Chute Generating Station is a hydroelectric power facility located on the Madawaska River in Ontario, Canada.
-
B.
McArthur Falls Generating Station
McArthur Falls Generating Station is a hydroelectric power plant on the Winnipeg River in Manitoba, Canada, that generates electricity by harnessing the river’s flow.
-
C.
Comanche Peak Nuclear Power Plant
Comanche Peak Nuclear Power Plant is a commercial nuclear power generating facility in North Texas that supplies electricity to the region and is one of the state’s major nuclear power stations.
-
D.
Little Long Generating Station
Little Long Generating Station is a hydroelectric power plant located on the Mattagami River in northeastern Ontario, Canada, that contributes to the region’s electricity supply.
-
E.
Fort Peck Power Plant
Fort Peck Power Plant is a hydroelectric generating facility in Montana that converts water released from Fort Peck Dam into electrical power for the surrounding region.
- F. None of above. chosen
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e0b4a935588190b9446a99b37ced44 |
completed | April 16, 2026, 10:06 a.m. |
| NER | Named-entity recognition | batch_69e67a44ecf48190ba5a3872af500dc8 |
completed | April 20, 2026, 7:11 p.m. |
Created at: April 16, 2026, 11:30 a.m.