Triple

T20414479
Position Surface form Disambiguated ID Type / Status
Subject Texas State Highway 360 E500671 entity
Predicate hasJunctionWith P1018 FINISHED
Object Interstate 20 frontage roads NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Interstate 20 frontage roads | Statement: [Texas State Highway 360, hasJunctionWith, Interstate 20 frontage roads]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Interstate 20 frontage roads
Context triple: [Texas State Highway 360, hasJunctionWith, Interstate 20 frontage roads]
  • A. Interstate 205
    Interstate 205 is a major auxiliary Interstate Highway in California that serves as a key connector between Interstate 5 and Interstate 580, facilitating traffic between the Central Valley and the San Francisco Bay Area.
  • B. Interstate 205
    Interstate 205 is a major auxiliary Interstate Highway that serves as an eastern bypass of Portland, Oregon, connecting I-5 in Oregon to I-5 in Washington across the Columbia River.
  • C. Interstate 215
    Interstate 215 is a beltway freeway that partially encircles the Salt Lake City metropolitan area, providing a major route for regional traffic and access to key destinations.
  • D. Interstate 215
    Interstate 215 is a beltway freeway serving the Las Vegas metropolitan area in southern Nevada, providing a key circumferential route around the city and connecting several major highways.
  • E. Interstate 215
    Interstate 215 is a major auxiliary Interstate Highway in Southern California that serves as a bypass and connector route through the Inland Empire region.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Interstate 20 frontage roads
Target entity description: Interstate 20 frontage roads are the parallel access roads running alongside Interstate 20 that provide local entry to businesses, neighborhoods, and intersecting streets without directly using the main freeway lanes.
  • A. Interstate 205
    Interstate 205 is a major auxiliary Interstate Highway in California that serves as a key connector between Interstate 5 and Interstate 580, facilitating traffic between the Central Valley and the San Francisco Bay Area.
  • B. Interstate 205
    Interstate 205 is a major auxiliary Interstate Highway that serves as an eastern bypass of Portland, Oregon, connecting I-5 in Oregon to I-5 in Washington across the Columbia River.
  • C. Interstate 215
    Interstate 215 is a beltway freeway that partially encircles the Salt Lake City metropolitan area, providing a major route for regional traffic and access to key destinations.
  • D. Interstate 215
    Interstate 215 is a beltway freeway serving the Las Vegas metropolitan area in southern Nevada, providing a key circumferential route around the city and connecting several major highways.
  • E. Interstate 215
    Interstate 215 is a major auxiliary Interstate Highway in Southern California that serves as a bypass and connector route through the Inland Empire region.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b4a935588190b9446a99b37ced44 completed April 16, 2026, 10:06 a.m.
NER Named-entity recognition batch_69e67a4281048190a2b016ec16b7d203 completed April 20, 2026, 7:10 p.m.
Created at: April 16, 2026, 11:30 a.m.