Triple

T20406554
Position Surface form Disambiguated ID Type / Status
Subject Tajrish E500481 entity
Predicate terminusOf P3375 FINISHED
Object Tehran Metro Line 1 NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Tehran Metro Line 1 | Statement: [Tajrish, terminusOf, Tehran Metro Line 1]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Tehran Metro Line 1
Context triple: [Tajrish, terminusOf, Tehran Metro Line 1]
  • A. Tehran Metro Line 1 chosen
    Tehran Metro Line 1 is the main north–south rapid transit line in Tehran’s metro system, running through many of the city’s central and densely populated areas.
  • B. Tehran Metro Line 2
    Tehran Metro Line 2 is a major east–west rapid transit line in Tehran’s metro system, serving numerous central and western districts and providing key transfer connections with several other lines.
  • C. Tehran Metro
    Tehran Metro is the rapid transit system serving Iran’s capital, providing extensive urban and suburban rail transport across the Tehran metropolitan area.
  • D. Tehran Metro Line 3
    Tehran Metro Line 3 is a major north–south rapid transit line in Tehran’s metro network, serving as one of the city’s key high-capacity urban rail corridors.
  • E. Tehran Metro Line 6
    Tehran Metro Line 6 is a major north–south and east–west rapid transit line in Tehran’s urban rail network, designed to improve connectivity across central and peripheral districts of Iran’s capital.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b4a81bec8190b69adfdc1336a015 completed April 16, 2026, 10:06 a.m.
NER Named-entity recognition batch_69e67992cfb88190ae49a1723e6667a1 completed April 20, 2026, 7:08 p.m.
Created at: April 16, 2026, 11:29 a.m.