Triple

T20395956
Position Surface form Disambiguated ID Type / Status
Subject Leawood Pump House E500203 entity
Predicate operator P179 FINISHED
Object Cromford Canal Company NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Cromford Canal Company | Statement: [Leawood Pump House, operator, Cromford Canal Company]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Cromford Canal Company
Context triple: [Leawood Pump House, operator, Cromford Canal Company]
  • A. Ellesmere Canal Company
    The Ellesmere Canal Company was a British canal company responsible for developing and operating sections of the historic Ellesmere Canal network during the late 18th and early 19th centuries.
  • B. Nottingham Canal Company
    The Nottingham Canal Company was the historical enterprise responsible for financing, constructing, and operating the Nottingham Canal in England during the canal-building era.
  • C. Lancaster Canal Company
    The Lancaster Canal Company was a British canal company responsible for developing and operating the Lancaster Canal in northwest England during the canal-building era of the late 18th and early 19th centuries.
  • D. Ashton Canal Company
    The Ashton Canal Company was the original private company responsible for constructing, operating, and managing the Ashton Canal during the industrial era in England.
  • E. Leeds and Liverpool Canal Company
    The Leeds and Liverpool Canal Company was the historic British canal company responsible for constructing and operating the Leeds and Liverpool Canal, a major industrial waterway linking the cities of Leeds and Liverpool across northern England.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Cromford Canal Company
Target entity description: The Cromford Canal Company was a British canal company responsible for constructing and managing the Cromford Canal during the Industrial Revolution to support regional trade and industry.
  • A. Ellesmere Canal Company
    The Ellesmere Canal Company was a British canal company responsible for developing and operating sections of the historic Ellesmere Canal network during the late 18th and early 19th centuries.
  • B. Nottingham Canal Company
    The Nottingham Canal Company was the historical enterprise responsible for financing, constructing, and operating the Nottingham Canal in England during the canal-building era.
  • C. Lancaster Canal Company
    The Lancaster Canal Company was a British canal company responsible for developing and operating the Lancaster Canal in northwest England during the canal-building era of the late 18th and early 19th centuries.
  • D. Ashton Canal Company
    The Ashton Canal Company was the original private company responsible for constructing, operating, and managing the Ashton Canal during the industrial era in England.
  • E. Leeds and Liverpool Canal Company
    The Leeds and Liverpool Canal Company was the historic British canal company responsible for constructing and operating the Leeds and Liverpool Canal, a major industrial waterway linking the cities of Leeds and Liverpool across northern England.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b4a71ebc8190b153a36c738730f4 completed April 16, 2026, 10:06 a.m.
NER Named-entity recognition batch_69e67912d7948190ac2fda8ce95e5c70 completed April 20, 2026, 7:05 p.m.
Created at: April 16, 2026, 11:28 a.m.