Triple

T20391435
Position Surface form Disambiguated ID Type / Status
Subject T-850 E498093 entity
Predicate programmingStatus P139941 FINISHED
Object reprogrammed by Resistance LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: reprogrammed by Resistance | Statement: [T-850, programmingStatus, reprogrammed by Resistance]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: programmingStatus
Context triple: [T-850, programmingStatus, reprogrammed by Resistance]
  • A. programStatus
    Indicates the current state or condition of a program within its lifecycle (e.g., planned, active, paused, completed, or terminated).
  • B. trainingStatus
    Indicates the current state or phase of an entity within a training or learning process.
  • C. worksStatus
    Indicates the current state or condition of an entity’s work or project, such as whether it is planned, in progress, completed, or otherwise categorized.
  • D. implementationStatus
    Indicates the current state or progress of carrying out or realizing something, such as a plan, design, or requirement.
  • E. programPhase
    Indicates the specific stage or phase within a broader program or process that an entity is currently associated with.
  • F. None of above. chosen

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b4a71ebc8190b153a36c738730f4 completed April 16, 2026, 10:06 a.m.
NER Named-entity recognition batch_69e6790f8d9c819093038f6bb6f47a92 completed April 20, 2026, 7:05 p.m.
PD Predicate disambiguation batch_69e57648be3c81908256838228cabf5c completed April 20, 2026, 12:41 a.m.
PDg Predicate description generation batch_69e58d7481508190a87c8b88f9df9879 completed April 20, 2026, 2:20 a.m.
Created at: April 16, 2026, 11:28 a.m.