Triple
T20368543
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Bulgarian rail network |
E496982
|
entity |
| Predicate | hasInternationalCorridor |
P110142
|
FINISHED |
| Object | Pan-European Corridor VIII |
—
|
NE NERFINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Pan-European Corridor VIII | Statement: [Bulgarian rail network, hasInternationalCorridor, Pan-European Corridor VIII]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Pan-European Corridor VIII Context triple: [Bulgarian rail network, hasInternationalCorridor, Pan-European Corridor VIII]
-
A.
Pan-European Corridor IV
Pan-European Corridor IV is a major trans-European transport route linking Central Europe with Greece and Turkey through a network of road and rail connections.
-
B.
Pan-European Corridor III
Pan-European Corridor III is a major trans-European transport route linking Western and Eastern Europe, running from Germany through Poland and Ukraine toward Eastern markets.
-
C.
Pan-European Transport Corridor IX
Pan-European Transport Corridor IX is a major trans-European transport route connecting northern and southern Europe, facilitating trade and mobility across multiple countries including Greece and Bulgaria.
-
D.
Pan-European Corridor Xc
Pan-European Corridor Xc is a major European transport route that forms a branch of Corridor X, linking central Europe with southern and eastern parts of the Balkan Peninsula.
-
E.
Pan-European Corridor V
Pan-European Corridor V is a major trans-European transport route that links key cities in Central and Eastern Europe, facilitating trade and mobility between Western Europe and countries such as Ukraine and Poland.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Pan-European Corridor VIII Target entity description: Pan-European Corridor VIII is a major trans-European transport route linking the Adriatic and Black Seas through Albania, North Macedonia, and Bulgaria, facilitating regional trade and connectivity.
-
A.
Pan-European Corridor IV
Pan-European Corridor IV is a major trans-European transport route linking Central Europe with Greece and Turkey through a network of road and rail connections.
-
B.
Pan-European Corridor III
Pan-European Corridor III is a major trans-European transport route linking Western and Eastern Europe, running from Germany through Poland and Ukraine toward Eastern markets.
-
C.
Pan-European Transport Corridor IX
Pan-European Transport Corridor IX is a major trans-European transport route connecting northern and southern Europe, facilitating trade and mobility across multiple countries including Greece and Bulgaria.
-
D.
Pan-European Corridor Xc
Pan-European Corridor Xc is a major European transport route that forms a branch of Corridor X, linking central Europe with southern and eastern parts of the Balkan Peninsula.
-
E.
Pan-European Corridor V
Pan-European Corridor V is a major trans-European transport route that links key cities in Central and Eastern Europe, facilitating trade and mobility between Western Europe and countries such as Ukraine and Poland.
- F. None of above. chosen
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e0b4a4f9b081908a5a021919c21ccb |
completed | April 16, 2026, 10:06 a.m. |
| NER | Named-entity recognition | batch_69e678734b188190bb2c5863023f9f8c |
completed | April 20, 2026, 7:03 p.m. |
Created at: April 16, 2026, 11:26 a.m.