Triple
T2036613
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | NY 202 |
E44644
|
entity |
| Predicate | hasJunctionWith |
P1018
|
FINISHED |
| Object | US 202 |
E227975
|
NE FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: US 202 | Statement: [NY 202, hasJunctionWith, US 202]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: US 202 Context triple: [NY 202, hasJunctionWith, US 202]
-
A.
US 202
chosen
US 202 is a U.S. highway running through the northeastern United States, connecting cities in states such as Delaware, Pennsylvania, New Jersey, New York, and beyond.
-
B.
US-2 eastbound
US-2 eastbound is the eastward segment of the U.S. Route 2 highway that runs across the northern United States, connecting communities from the Great Lakes region through northern New England.
-
C.
NY 202
NY 202 is a New York state highway that serves as a key east–west route in the lower Hudson Valley, connecting communities and major crossings such as the Bear Mountain area.
-
D.
US 9W
US 9W is a north–south United States highway running along the west side of the Hudson River in New York and New Jersey, serving as a major regional route through numerous riverfront communities.
-
E.
Route 2020
Route 2020 is an extension of the Dubai Metro built to connect the existing network to the Expo 2020 site and surrounding developing areas.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a889159ec481908f9e4472d9f480c7 |
completed | March 4, 2026, 7:33 p.m. |
| NER | Named-entity recognition | batch_69abb9363b608190b42aa6d3f3fd78c4 |
completed | March 7, 2026, 5:35 a.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69ae2710f6408190b7feb99efa7ce9bb |
completed | March 9, 2026, 1:49 a.m. |
Created at: March 4, 2026, 7:39 p.m.