Triple
T20345134
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Zollverein Coal Mine Industrial Complex |
E495846
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | coking plant |
C4822
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: coking plant Context triple: [Zollverein Coal Mine Industrial Complex, instanceOf, coking plant]
-
A.
industrial plant
chosen
An industrial plant is a large-scale facility where raw materials are transformed through mechanical, chemical, or biological processes into finished or semi-finished products using specialized equipment and coordinated operations.
-
B.
oil processing facility
An oil processing facility is an industrial complex where crude oil is received, separated, treated, and refined into usable products such as fuels, lubricants, and feedstocks under controlled conditions.
-
C.
manufacturing plant
A manufacturing plant is a large-scale industrial facility where raw materials are transformed through organized processes, machinery, and labor into finished goods or components.
-
D.
blast furnace
A blast furnace is a large, vertical industrial furnace used to smelt iron ore into molten iron by blowing hot air through a mixture of ore, coke, and limestone at high temperatures.
-
E.
coal-fired power station
A coal-fired power station is an industrial facility that burns coal to produce steam, which drives turbines connected to generators to produce electricity, while emitting significant air pollutants and greenhouse gases.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e0b4a3320881909495ae8bc30bc2dc |
completed | April 16, 2026, 10:06 a.m. |
Created at: April 16, 2026, 11:24 a.m.