Triple

T20338189
Position Surface form Disambiguated ID Type / Status
Subject Prince’s Lodging, Newmarket (designs) E495669 entity
Predicate instanceOf P0 FINISHED
Object unexecuted architectural project C31067 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: unexecuted architectural project
Context triple: [Prince’s Lodging, Newmarket (designs), instanceOf, unexecuted architectural project]
  • A. unfinished building project
    An unfinished building project is a partially constructed structure where work has been halted before completion, leaving it unusable for its intended purpose.
  • B. visionary architecture project
    A visionary architecture project is a forward-thinking, often speculative design concept that reimagines the built environment through innovative forms, technologies, and social or ecological paradigms beyond conventional practice.
  • C. architectural project involvement
    Architectural project involvement is the coordinated participation of stakeholders, professionals, and resources throughout the planning, design, and execution phases of an architectural endeavor.
  • D. unbuilt aircraft project
    An unbuilt aircraft project is a conceptual or proposed airplane design that was planned and possibly studied or partially developed but never constructed or flown.
  • E. unbuilt building chosen
    An unbuilt building is a fully conceived architectural design that exists only in plans, models, or visualizations and has not yet been constructed in physical form.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b4a1a09881908d97270d6971a25a completed April 16, 2026, 10:06 a.m.
Created at: April 16, 2026, 11:23 a.m.