Triple

T20336667
Position Surface form Disambiguated ID Type / Status
Subject PTH 75 E495625 entity
Predicate connectsTo P845 FINISHED
Object United States border at Emerson NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: United States border at Emerson | Statement: [PTH 75, connectsTo, United States border at Emerson]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: United States border at Emerson
Context triple: [PTH 75, connectsTo, United States border at Emerson]
  • A. U.S. border at Nogales
    The U.S. border at Nogales is a major international crossing point between Arizona and Sonora, serving as a key gateway for trade and travel between the United States and Mexico.
  • B. Warroad–Sprague Border Crossing
    The Warroad–Sprague Border Crossing is an international port of entry connecting Warroad, Minnesota, in the United States with Sprague, Manitoba, in Canada, serving as a key roadway link between the two countries in that region.
  • C. Blaine border crossing
    The Blaine border crossing is a major land port of entry between the United States and Canada in Washington State, serving as one of the busiest gateways for passenger and commercial traffic along the Pacific Northwest corridor.
  • D. Neche–Gretna Border Crossing
    The Neche–Gretna Border Crossing is an international port of entry connecting Neche, North Dakota, in the United States with Gretna, Manitoba, in Canada.
  • E. Fort Kent–Clair Border Crossing
    The Fort Kent–Clair Border Crossing is an international crossing over the Saint John River connecting Fort Kent, Maine, in the United States with Clair, New Brunswick, in Canada.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: United States border at Emerson
Target entity description: The United States border at Emerson is a major Canada–U.S. land crossing in Manitoba that links Canadian Highway 75 with the American road network.
  • A. U.S. border at Nogales
    The U.S. border at Nogales is a major international crossing point between Arizona and Sonora, serving as a key gateway for trade and travel between the United States and Mexico.
  • B. Warroad–Sprague Border Crossing
    The Warroad–Sprague Border Crossing is an international port of entry connecting Warroad, Minnesota, in the United States with Sprague, Manitoba, in Canada, serving as a key roadway link between the two countries in that region.
  • C. Blaine border crossing
    The Blaine border crossing is a major land port of entry between the United States and Canada in Washington State, serving as one of the busiest gateways for passenger and commercial traffic along the Pacific Northwest corridor.
  • D. Neche–Gretna Border Crossing
    The Neche–Gretna Border Crossing is an international port of entry connecting Neche, North Dakota, in the United States with Gretna, Manitoba, in Canada.
  • E. Fort Kent–Clair Border Crossing
    The Fort Kent–Clair Border Crossing is an international crossing over the Saint John River connecting Fort Kent, Maine, in the United States with Clair, New Brunswick, in Canada.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b4a1a09881908d97270d6971a25a completed April 16, 2026, 10:06 a.m.
NER Named-entity recognition batch_69e677ed75e081909bfc534033ac1c59 completed April 20, 2026, 7:01 p.m.
Created at: April 16, 2026, 11:23 a.m.