Triple

T20317041
Position Surface form Disambiguated ID Type / Status
Subject State Second Pension E510405 entity
Predicate ceasedAccrualFor P93738 FINISHED
Object people reaching State Pension age on or after 6 April 2016 LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: people reaching State Pension age on or after 6 April 2016 | Statement: [State Second Pension, ceasedAccrualFor, people reaching State Pension age on or after 6 April 2016]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: ceasedAccrualFor
Context triple: [State Second Pension, ceasedAccrualFor, people reaching State Pension age on or after 6 April 2016]
  • A. ceasedActivityUnder
    Indicates that an entity stopped performing a particular activity while under the authority, influence, or conditions imposed by another entity.
  • B. ceasedToApplyOn chosen
    Indicates that a rule, condition, or status stopped being valid or in effect starting from a specific point in time.
  • C. ceasedOperationsAs
    Indicates that an entity stopped functioning or operating in a particular role, capacity, or status.
  • D. cessationDate
    Indicates the date on which an ongoing state, activity, or relationship comes to an end.
  • E. ceasedOperationsDuring
    Indicates that an entity stopped functioning or carrying out its activities at some point within the specified time period.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b4c7491c8190961113c4283b10b0 completed April 16, 2026, 10:07 a.m.
NER Named-entity recognition batch_69e67788ca3c8190a3496fd54a5870d6 completed April 20, 2026, 6:59 p.m.
PD Predicate disambiguation batch_69e55b21b09081909e46691b6f45a07f completed April 19, 2026, 10:45 p.m.
Created at: April 16, 2026, 11:19 a.m.