Triple

T20314695
Position Surface form Disambiguated ID Type / Status
Subject Frankfurt–Paris E510348 entity
Predicate instanceOf P0 FINISHED
Object high-speed rail connection C75 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: high-speed rail connection
Context triple: [Frankfurt–Paris, instanceOf, high-speed rail connection]
  • A. rapid rail system
    A rapid rail system is a high-speed, high-capacity railway network designed to transport large numbers of passengers quickly and efficiently between urban or regional destinations using dedicated tracks and frequent service.
  • B. rapid transit line
    A rapid transit line is a high-capacity, high-frequency urban rail route operating on an exclusive or mostly separated right-of-way to provide fast, reliable public transportation between key areas of a city or metropolitan region.
  • C. passenger rail service chosen
    Passenger rail service is a transportation system that operates trains to carry people between locations on a scheduled basis, typically offering various classes of comfort and amenities.
  • D. proposed high-speed ground transportation system
    A proposed high-speed ground transportation system is a conceptual network of advanced vehicles, infrastructure, and control technologies designed to move passengers or freight rapidly and efficiently between destinations along dedicated terrestrial corridors.
  • E. commuter rail line
    A commuter rail line is a passenger train service that operates on fixed tracks and schedules to connect suburban or outlying areas with a central city, primarily serving daily work and school commuters.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b4c7491c8190961113c4283b10b0 completed April 16, 2026, 10:07 a.m.
Created at: April 16, 2026, 11:19 a.m.