Triple

T20314504
Position Surface form Disambiguated ID Type / Status
Subject DB Regio Bus E510343 entity
Predicate associatedWith P37 FINISHED
Object DB Regio Schiene NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: DB Regio Schiene | Statement: [DB Regio Bus, associatedWith, DB Regio Schiene]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: DB Regio Schiene
Context triple: [DB Regio Bus, associatedWith, DB Regio Schiene]
  • A. SNCB/NMBS
    SNCB/NMBS is the Belgian national railway company responsible for operating most passenger train services and managing much of the rail infrastructure in Belgium.
  • B. ProRail
    ProRail is the Dutch government-owned company responsible for managing and maintaining the national railway infrastructure in the Netherlands.
  • C. Infrabel
    Infrabel is the Belgian railway infrastructure manager responsible for the construction, maintenance, and operation of the national rail network.
  • D. Belgian HSL lines
    The Belgian HSL lines are Belgium’s dedicated high-speed railway routes that connect major Belgian cities with neighboring countries as part of the broader European high-speed rail network.
  • E. DB Regio chosen
    DB Regio is a division of Germany’s national railway company that operates most of the country’s regional and local passenger train services.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b4c7491c8190961113c4283b10b0 completed April 16, 2026, 10:07 a.m.
NER Named-entity recognition batch_69e67745e2448190b5611382fe338bb2 completed April 20, 2026, 6:58 p.m.
Created at: April 16, 2026, 11:19 a.m.