Triple

T20302104
Position Surface form Disambiguated ID Type / Status
Subject Fort Andrews E505506 entity
Predicate hasBattery P8164 FINISHED
Object Battery Williams NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Battery Williams | Statement: [Fort Andrews, hasBattery, Battery Williams]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Battery Williams
Context triple: [Fort Andrews, hasBattery, Battery Williams]
  • A. Ventra
    Ventra is the contactless fare payment system used across Chicago’s public transit network, including buses and trains.
  • B. Battery Smith
    Battery Smith is a coastal artillery battery that formed part of the defensive fortifications at Fort Mills on Corregidor Island in the Philippines.
  • C. Fortum Charge & Drive
    Fortum Charge & Drive is Fortum’s electric vehicle charging network and service platform, providing public and home charging solutions primarily across the Nordic region and parts of Europe.
  • D. Battery Hearn
    Battery Hearn is a historic coastal artillery battery on Corregidor Island in the Philippines, notable for its large seacoast gun and role in World War II defenses of Manila Bay.
  • E. BP Chargemaster
    BP Chargemaster was a UK-based electric vehicle charging network and service provider that operated public and workplace charge points before being rebranded as bp pulse.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Battery Williams
Target entity description: Battery Williams was a coastal artillery battery that formed part of the defensive fortifications at Fort Andrews in Massachusetts.
  • A. Ventra
    Ventra is the contactless fare payment system used across Chicago’s public transit network, including buses and trains.
  • B. Battery Smith
    Battery Smith is a coastal artillery battery that formed part of the defensive fortifications at Fort Mills on Corregidor Island in the Philippines.
  • C. Fortum Charge & Drive
    Fortum Charge & Drive is Fortum’s electric vehicle charging network and service platform, providing public and home charging solutions primarily across the Nordic region and parts of Europe.
  • D. Battery Hearn
    Battery Hearn is a historic coastal artillery battery on Corregidor Island in the Philippines, notable for its large seacoast gun and role in World War II defenses of Manila Bay.
  • E. BP Chargemaster
    BP Chargemaster was a UK-based electric vehicle charging network and service provider that operated public and workplace charge points before being rebranded as bp pulse.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b4b8ab648190906e18538c250148 completed April 16, 2026, 10:06 a.m.
NER Named-entity recognition batch_69e6770d82b48190b21ce7c52ec6d5a0 completed April 20, 2026, 6:57 p.m.
Created at: April 16, 2026, 11:17 a.m.