Triple

T20290375
Position Surface form Disambiguated ID Type / Status
Subject Georgia State Route 540 E510003 entity
Predicate partOf P40 FINISHED
Object Fall Line Freeway corridor in Georgia NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Fall Line Freeway corridor in Georgia | Statement: [Georgia State Route 540, partOf, Fall Line Freeway corridor in Georgia]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Fall Line Freeway corridor in Georgia
Context triple: [Georgia State Route 540, partOf, Fall Line Freeway corridor in Georgia]
  • A. East–West Highway of Georgia
    The East–West Highway of Georgia is a major transportation corridor that spans the country, linking key cities and regions and serving as a vital route for domestic travel and international trade.
  • B. Interstate 85 in Georgia
    Interstate 85 in Georgia is a major north–south Interstate Highway that runs through key cities including Atlanta, serving as a primary transportation corridor in the state and the southeastern United States.
  • C. Interstate 285 in Georgia
    Interstate 285 in Georgia is the beltway encircling Atlanta, serving as a major bypass and connector for multiple interstate highways around the city.
  • D. Interstate 16 in Georgia
    Interstate 16 in Georgia is an east–west Interstate Highway that connects Macon to Savannah, serving as a major route between central Georgia and the Atlantic coast.
  • E. Interstate 75 in Georgia
    Interstate 75 in Georgia is a major north–south freeway that serves as a primary transportation corridor through the state, connecting cities like Valdosta, Macon, and Atlanta as part of the national Interstate Highway System.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Fall Line Freeway corridor in Georgia
Target entity description: The Fall Line Freeway corridor in Georgia is a major east–west transportation route across the state, designed to improve regional connectivity and economic development by linking cities along the geological fall line.
  • A. East–West Highway of Georgia
    The East–West Highway of Georgia is a major transportation corridor that spans the country, linking key cities and regions and serving as a vital route for domestic travel and international trade.
  • B. Interstate 85 in Georgia
    Interstate 85 in Georgia is a major north–south Interstate Highway that runs through key cities including Atlanta, serving as a primary transportation corridor in the state and the southeastern United States.
  • C. Interstate 285 in Georgia
    Interstate 285 in Georgia is the beltway encircling Atlanta, serving as a major bypass and connector for multiple interstate highways around the city.
  • D. Interstate 16 in Georgia
    Interstate 16 in Georgia is an east–west Interstate Highway that connects Macon to Savannah, serving as a major route between central Georgia and the Atlantic coast.
  • E. Interstate 75 in Georgia
    Interstate 75 in Georgia is a major north–south freeway that serves as a primary transportation corridor through the state, connecting cities like Valdosta, Macon, and Atlanta as part of the national Interstate Highway System.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b4c652388190b782cad965e5a098 completed April 16, 2026, 10:07 a.m.
NER Named-entity recognition batch_69e67695d4d48190b932317d37aa95d9 completed April 20, 2026, 6:55 p.m.
Created at: April 16, 2026, 11:12 a.m.