Triple

T20277202
Position Surface form Disambiguated ID Type / Status
Subject Verona Porta Nuova railway station E503046 entity
Predicate railwayLine P848 FINISHED
Object Verona–Brenner corridor NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Verona–Brenner corridor | Statement: [Verona Porta Nuova railway station, railwayLine, Verona–Brenner corridor]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Verona–Brenner corridor
Context triple: [Verona Porta Nuova railway station, railwayLine, Verona–Brenner corridor]
  • A. Turin–Trieste corridor
    The Turin–Trieste corridor is a major east–west transport axis in northern Italy linking the industrial city of Turin with the Adriatic port city of Trieste and intermediate urban and economic centers.
  • B. Verona–Trento route
    The Verona–Trento route is a major transport corridor in northern Italy that connects the city of Verona with Trento through the Adige Valley, serving as a key link between the Po Valley and the Alps.
  • C. Brenner corridor chosen
    The Brenner corridor is a major trans-Alpine transport route linking Italy with Austria and northern Europe, serving as a key axis for both rail and road traffic across the Brenner Pass.
  • D. Brno–Vienna corridor
    The Brno–Vienna corridor is a major Central European transport and development axis linking the Czech city of Brno with Austria’s capital Vienna, supporting regional connectivity and economic integration.
  • E. Lyon–Turin road corridor
    The Lyon–Turin road corridor is a major transalpine transport axis linking the Lyon region in France with northern Italy, facilitating significant passenger and freight movement across the Alps.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b4b0e79c8190bd61f22ef1329fa8 completed April 16, 2026, 10:06 a.m.
NER Named-entity recognition batch_69e675e4cdfc81908c7cb4519a7d744b completed April 20, 2026, 6:52 p.m.
Created at: April 16, 2026, 10:35 a.m.