Triple
T20275878
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Miss Tilly shipwrecked on Mount Mayday |
E503014
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | themed amusement park structure |
C8768
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: themed amusement park structure Context triple: [Miss Tilly shipwrecked on Mount Mayday, instanceOf, themed amusement park structure]
-
A.
themed entertainment attraction
A themed entertainment attraction is an immersive, story-driven experience that combines environment design, technology, and performance to engage guests in a specific narrative or world.
-
B.
amusement park attraction
chosen
An amusement park attraction is a designed entertainment feature or ride that provides guests with thrilling, enjoyable, or immersive experiences within a themed recreational setting.
-
C.
amusement garden
An amusement garden is a landscaped outdoor space that combines traditional garden features with recreational attractions and playful installations designed for entertainment and leisure.
-
D.
theme park complex
A theme park complex is a large, integrated entertainment destination that combines multiple themed parks, attractions, accommodations, dining, and retail areas into a unified visitor experience.
-
E.
theme park setting
A theme park setting is a large, immersive entertainment environment organized around specific themes, featuring rides, attractions, performances, and themed areas designed to create a cohesive, fantastical experience for visitors.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e0b4b0e79c8190bd61f22ef1329fa8 |
completed | April 16, 2026, 10:06 a.m. |
Created at: April 16, 2026, 10:32 a.m.