Triple

T20262350
Position Surface form Disambiguated ID Type / Status
Subject East Point Road E498872 entity
Predicate instanceOf P0 FINISHED
Object coastal roadway C34900 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: coastal roadway
Context triple: [East Point Road, instanceOf, coastal roadway]
  • A. scenic coastal road chosen
    A scenic coastal road is a winding route that follows the shoreline, offering travelers expansive views of the ocean, cliffs, beaches, and surrounding natural landscapes.
  • B. road transportation corridor
    A road transportation corridor is a designated linear area of land that accommodates one or more roadways and associated infrastructure to enable the efficient movement of vehicles, goods, and people between key origins and destinations.
  • C. arterial roadway
    An arterial roadway is a high-capacity urban or suburban street designed to efficiently carry large volumes of through traffic between local streets and highways while providing limited direct property access.
  • D. roadway approach
    A roadway approach is the segment of a road leading up to an intersection, junction, or control device, where vehicles transition from through movement to potential stopping, turning, or yielding maneuvers.
  • E. riverside thoroughfare
    A riverside thoroughfare is a road, path, or promenade that runs alongside a river, facilitating transportation, access, and recreational use of the waterfront.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69da6275fa6c8190952924930adee150 completed April 11, 2026, 3:02 p.m.
Created at: April 11, 2026, 11:41 p.m.