Triple
T20261291
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Cumberland Terrace |
E498842
|
entity |
| Predicate | partOf |
P40
|
FINISHED |
| Object | Regent's Park development |
—
|
NE NERFINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Regent's Park development | Statement: [Cumberland Terrace, partOf, Regent's Park development]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Regent's Park development Context triple: [Cumberland Terrace, partOf, Regent's Park development]
-
A.
Carlton House Terrace development
Carlton House Terrace development is a prestigious 19th-century neoclassical terrace complex in central London, known for its grand townhouses overlooking The Mall and St James’s Park.
-
B.
Thames Gateway regeneration area
The Thames Gateway regeneration area is a major urban renewal and development corridor in South East England focused on revitalizing former industrial and brownfield sites along the River Thames.
-
C.
Battersea Power Station Estate
Battersea Power Station Estate is a major mixed-use riverside redevelopment in London built around the restored Grade II* listed Battersea Power Station, featuring homes, offices, shops, leisure venues, and public spaces.
-
D.
Barbican Estate
Barbican Estate is a prominent post-war Brutalist residential and cultural complex in central London, known for its distinctive architecture and the Barbican Centre arts venue.
-
E.
Regent Park
Regent Park is a historically significant, culturally diverse neighborhood in downtown Toronto known for being Canada’s first and one of its largest public housing communities, now undergoing major revitalization.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Regent's Park development Target entity description: Regent's Park development is a grand early 19th-century urban planning scheme in London, designed largely by John Nash, featuring a landscaped park surrounded by elegant neoclassical terraces and villas.
-
A.
Carlton House Terrace development
Carlton House Terrace development is a prestigious 19th-century neoclassical terrace complex in central London, known for its grand townhouses overlooking The Mall and St James’s Park.
-
B.
Thames Gateway regeneration area
The Thames Gateway regeneration area is a major urban renewal and development corridor in South East England focused on revitalizing former industrial and brownfield sites along the River Thames.
-
C.
Battersea Power Station Estate
Battersea Power Station Estate is a major mixed-use riverside redevelopment in London built around the restored Grade II* listed Battersea Power Station, featuring homes, offices, shops, leisure venues, and public spaces.
-
D.
Barbican Estate
Barbican Estate is a prominent post-war Brutalist residential and cultural complex in central London, known for its distinctive architecture and the Barbican Centre arts venue.
-
E.
Regent Park
Regent Park is a historically significant, culturally diverse neighborhood in downtown Toronto known for being Canada’s first and one of its largest public housing communities, now undergoing major revitalization.
- F. None of above. chosen
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69da6275fa6c8190952924930adee150 |
completed | April 11, 2026, 3:02 p.m. |
| NER | Named-entity recognition | batch_69e674ca77c081909cd2f44ccfe3662d |
completed | April 20, 2026, 6:47 p.m. |
Created at: April 11, 2026, 11:41 p.m.