Triple

T20260265
Position Surface form Disambiguated ID Type / Status
Subject Interstate 526 E498813 entity
Predicate connectsTo P845 FINISHED
Object South Carolina Highway 30 NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: South Carolina Highway 30 | Statement: [Interstate 526, connectsTo, South Carolina Highway 30]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: South Carolina Highway 30
Context triple: [Interstate 526, connectsTo, South Carolina Highway 30]
  • A. South Carolina Highway 31
    South Carolina Highway 31 is a major limited-access highway in the Myrtle Beach area that serves as a key north–south bypass route through Horry County.
  • B. South Carolina Highway 34
    South Carolina Highway 34 is an east–west state highway in South Carolina that connects several communities across the state, including rural areas such as Dillon County.
  • C. South Carolina Highway 3
    South Carolina Highway 3 is a primary state highway in South Carolina that runs through rural communities in the western part of the state, including Allendale County.
  • D. South Carolina Highway 39
    South Carolina Highway 39 is a primary state highway running through central South Carolina, connecting several rural communities and small towns, including Wagener.
  • E. South Carolina Highway 38
    South Carolina Highway 38 is a primary state highway in northeastern South Carolina that connects rural communities and serves as a key route between Interstate 95 and the Myrtle Beach area.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: South Carolina Highway 30
Target entity description: South Carolina Highway 30 is a short primary state highway in Charleston, South Carolina, that serves as a key connector between downtown Charleston and the James Island area.
  • A. South Carolina Highway 31
    South Carolina Highway 31 is a major limited-access highway in the Myrtle Beach area that serves as a key north–south bypass route through Horry County.
  • B. South Carolina Highway 34
    South Carolina Highway 34 is an east–west state highway in South Carolina that connects several communities across the state, including rural areas such as Dillon County.
  • C. South Carolina Highway 3
    South Carolina Highway 3 is a primary state highway in South Carolina that runs through rural communities in the western part of the state, including Allendale County.
  • D. South Carolina Highway 39
    South Carolina Highway 39 is a primary state highway running through central South Carolina, connecting several rural communities and small towns, including Wagener.
  • E. South Carolina Highway 38
    South Carolina Highway 38 is a primary state highway in northeastern South Carolina that connects rural communities and serves as a key route between Interstate 95 and the Myrtle Beach area.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69da6275fa6c8190952924930adee150 completed April 11, 2026, 3:02 p.m.
NER Named-entity recognition batch_69e674c90d00819082f68822635ee86a completed April 20, 2026, 6:47 p.m.
Created at: April 11, 2026, 11:41 p.m.