Triple

T2025083
Position Surface form Disambiguated ID Type / Status
Subject Coralville, Iowa E44188 entity
Predicate hasDam P8736 FINISHED
Object Coralville Dam E241576 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Coralville Dam | Statement: [Coralville, Iowa, hasDam, Coralville Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Coralville Dam
Context triple: [Coralville, Iowa, hasDam, Coralville Dam]
  • A. Coralville Dam chosen
    Coralville Dam is a flood-control and recreational dam on the Iowa River in Iowa, known for exposing the nearby Devonian Fossil Gorge after major flood events.
  • B. Conklingville Dam
    Conklingville Dam is a concrete gravity dam in New York that created the Great Sacandaga Lake reservoir for flood control and hydroelectric power generation.
  • C. McClure Dam
    McClure Dam is a hydroelectric dam on the Dead River in Michigan, forming McClure Basin and providing power and water management for the surrounding region.
  • D. Denison Dam
    Denison Dam is a large earthen dam on the Red River between Texas and Oklahoma, built for flood control, hydroelectric power generation, and water supply.
  • E. Bloomington Dam
    Bloomington Dam is a flood-control and water-supply structure on the North Branch Potomac River that helps regulate river flow and support regional water management.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a8891201bc8190aca837be6de41579 completed March 4, 2026, 7:33 p.m.
NER Named-entity recognition batch_69abb8f3faa08190a48ae1355d6e009f completed March 7, 2026, 5:34 a.m.
NED1 Entity disambiguation (via context triple) batch_69ae6ae88ad08190a0a638cad2566f2e completed March 9, 2026, 6:38 a.m.
Created at: March 4, 2026, 7:38 p.m.