Triple

T20249715
Position Surface form Disambiguated ID Type / Status
Subject Crestview as a transportation hub E498518 entity
Predicate instanceOf P0 FINISHED
Object transportation hub role C82 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: transportation hub role
Context triple: [Crestview as a transportation hub, instanceOf, transportation hub role]
  • A. transport hub chosen
    A transport hub is a central location where multiple modes or routes of transportation intersect, enabling the efficient transfer of passengers or goods between them.
  • B. ground transportation facility
    A ground transportation facility is a designated location that supports the movement, transfer, and management of passengers or goods via land-based modes such as buses, trains, cars, or trucks.
  • C. combined civic building and transportation hub
    A combined civic building and transportation hub is a multifunctional public facility that integrates government or community services with major transit infrastructure to centralize access, improve connectivity, and enhance urban efficiency.
  • D. transport hub identifier
    A transport hub identifier uniquely labels a specific transportation node—such as an airport, train station, or bus terminal—to enable unambiguous reference and coordination across systems.
  • E. group of passenger rail terminals
    A group of passenger rail terminals is a collection of interconnected or related railway stations designed for boarding, alighting, and transferring passengers within a coordinated transport network.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69da6274c58c81909c646eabed6f4f30 completed April 11, 2026, 3:02 p.m.
Created at: April 11, 2026, 11:41 p.m.