Triple

T20247587
Position Surface form Disambiguated ID Type / Status
Subject Gotthard axis E498462 entity
Predicate instanceOf P0 FINISHED
Object rail and road corridor C2952 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: rail and road corridor
Context triple: [Gotthard axis, instanceOf, rail and road corridor]
  • A. freight rail corridor
    A freight rail corridor is a designated railway route primarily used for the efficient, high-capacity movement of goods and cargo between industrial, commercial, and logistics hubs.
  • B. transport corridor chosen
    A transport corridor is a designated route or geographic band that concentrates and connects major transportation infrastructure—such as roads, railways, ports, and logistics hubs—to facilitate efficient movement of people and goods between key locations.
  • C. road transportation corridor
    A road transportation corridor is a designated linear area of land that accommodates one or more roadways and associated infrastructure to enable the efficient movement of vehicles, goods, and people between key origins and destinations.
  • D. underground rail corridor
    An underground rail corridor is a subsurface passageway engineered to safely guide trains between stations, housing tracks, utilities, and supporting infrastructure while minimizing surface disruption.
  • E. railroad line
    A railroad line is a fixed route consisting of tracks and associated infrastructure over which trains operate to transport passengers or freight between locations.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69da6274c58c81909c646eabed6f4f30 completed April 11, 2026, 3:02 p.m.
Created at: April 11, 2026, 11:40 p.m.