Triple

T20246422
Position Surface form Disambiguated ID Type / Status
Subject Lake Conroe E498435 entity
Predicate managingAgency P86 FINISHED
Object San Jacinto River Authority NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: San Jacinto River Authority | Statement: [Lake Conroe, managingAgency, San Jacinto River Authority]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: San Jacinto River Authority
Context triple: [Lake Conroe, managingAgency, San Jacinto River Authority]
  • A. San Antonio River Authority
    The San Antonio River Authority is a regional government agency responsible for managing, protecting, and enhancing the San Antonio River and its surrounding watershed in South Texas.
  • B. Brazos River Authority
    The Brazos River Authority is a Texas state agency responsible for developing, managing, and protecting the water resources of the Brazos River basin for municipal, industrial, agricultural, and environmental uses.
  • C. Nueces River Authority
    The Nueces River Authority is a regional governmental agency in Texas responsible for managing and protecting the water resources and environmental quality of the Nueces River basin.
  • D. Sabine River Authority of Texas
    The Sabine River Authority of Texas is a state-created agency responsible for developing, managing, and conserving the water resources of the Sabine River basin in Texas.
  • E. Harris County Flood Control District
    The Harris County Flood Control District is a governmental agency in Texas responsible for planning, implementing, and maintaining flood damage reduction projects and infrastructure throughout Harris County.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: San Jacinto River Authority
Target entity description: The San Jacinto River Authority is a Texas governmental agency responsible for developing, managing, and protecting water resources within the San Jacinto River basin.
  • A. San Antonio River Authority
    The San Antonio River Authority is a regional government agency responsible for managing, protecting, and enhancing the San Antonio River and its surrounding watershed in South Texas.
  • B. Brazos River Authority
    The Brazos River Authority is a Texas state agency responsible for developing, managing, and protecting the water resources of the Brazos River basin for municipal, industrial, agricultural, and environmental uses.
  • C. Nueces River Authority
    The Nueces River Authority is a regional governmental agency in Texas responsible for managing and protecting the water resources and environmental quality of the Nueces River basin.
  • D. Sabine River Authority of Texas
    The Sabine River Authority of Texas is a state-created agency responsible for developing, managing, and conserving the water resources of the Sabine River basin in Texas.
  • E. Harris County Flood Control District
    The Harris County Flood Control District is a governmental agency in Texas responsible for planning, implementing, and maintaining flood damage reduction projects and infrastructure throughout Harris County.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69da6274c58c81909c646eabed6f4f30 completed April 11, 2026, 3:02 p.m.
NER Named-entity recognition batch_69e673a26c8481908f408fb6426aece9 completed April 20, 2026, 6:42 p.m.
Created at: April 11, 2026, 11:40 p.m.