Triple
T20237835
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Vorotan River basin |
E498199
|
entity |
| Predicate | hasHydropowerInfrastructure |
P65769
|
FINISHED |
| Object | Vorotan hydropower cascade |
—
|
NE NERFINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Vorotan hydropower cascade | Statement: [Vorotan River basin, hasHydropowerInfrastructure, Vorotan hydropower cascade]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Vorotan hydropower cascade Context triple: [Vorotan River basin, hasHydropowerInfrastructure, Vorotan hydropower cascade]
-
A.
Tash-Kumyr Hydroelectric Power Plant
Tash-Kumyr Hydroelectric Power Plant is a hydroelectric facility in Kyrgyzstan that generates electricity from the Naryn River as part of a cascade of dams and power stations.
-
B.
Sevan HPP dam
The Sevan HPP dam is a hydroelectric power plant structure in Armenia that regulates outflow from Lake Sevan along the Hrazdan River to generate electricity and manage water resources.
-
C.
Baksan Hydroelectric Power Station
The Baksan Hydroelectric Power Station is a hydroelectric facility in Russia’s Kabardino-Balkaria region that generates electricity using the flow of the Baksan River.
-
D.
Aragvi River hydroelectric system
The Aragvi River hydroelectric system is a network of dams, reservoirs, and power stations on Georgia’s Aragvi River that generates hydroelectric power and regulates water resources for the region.
-
E.
Kara-Köl Hydroelectric Power Station
Kara-Köl Hydroelectric Power Station is a major hydroelectric facility in Kyrgyzstan that harnesses the Naryn River to generate electricity for the region and the national grid.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Vorotan hydropower cascade Target entity description: Vorotan hydropower cascade is a major hydroelectric power generation complex in Armenia that harnesses the flow of the Vorotan River through a series of dams and power stations.
-
A.
Tash-Kumyr Hydroelectric Power Plant
Tash-Kumyr Hydroelectric Power Plant is a hydroelectric facility in Kyrgyzstan that generates electricity from the Naryn River as part of a cascade of dams and power stations.
-
B.
Sevan HPP dam
The Sevan HPP dam is a hydroelectric power plant structure in Armenia that regulates outflow from Lake Sevan along the Hrazdan River to generate electricity and manage water resources.
-
C.
Baksan Hydroelectric Power Station
The Baksan Hydroelectric Power Station is a hydroelectric facility in Russia’s Kabardino-Balkaria region that generates electricity using the flow of the Baksan River.
-
D.
Aragvi River hydroelectric system
The Aragvi River hydroelectric system is a network of dams, reservoirs, and power stations on Georgia’s Aragvi River that generates hydroelectric power and regulates water resources for the region.
-
E.
Kara-Köl Hydroelectric Power Station
Kara-Köl Hydroelectric Power Station is a major hydroelectric facility in Kyrgyzstan that harnesses the Naryn River to generate electricity for the region and the national grid.
- F. None of above. chosen
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69da6274c58c81909c646eabed6f4f30 |
completed | April 11, 2026, 3:02 p.m. |
| NER | Named-entity recognition | batch_69e6716b4c148190bf663b8a747fbfa5 |
completed | April 20, 2026, 6:33 p.m. |
Created at: April 11, 2026, 11:40 p.m.