Triple

T20237835
Position Surface form Disambiguated ID Type / Status
Subject Vorotan River basin E498199 entity
Predicate hasHydropowerInfrastructure P65769 FINISHED
Object Vorotan hydropower cascade NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Vorotan hydropower cascade | Statement: [Vorotan River basin, hasHydropowerInfrastructure, Vorotan hydropower cascade]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Vorotan hydropower cascade
Context triple: [Vorotan River basin, hasHydropowerInfrastructure, Vorotan hydropower cascade]
  • A. Tash-Kumyr Hydroelectric Power Plant
    Tash-Kumyr Hydroelectric Power Plant is a hydroelectric facility in Kyrgyzstan that generates electricity from the Naryn River as part of a cascade of dams and power stations.
  • B. Sevan HPP dam
    The Sevan HPP dam is a hydroelectric power plant structure in Armenia that regulates outflow from Lake Sevan along the Hrazdan River to generate electricity and manage water resources.
  • C. Baksan Hydroelectric Power Station
    The Baksan Hydroelectric Power Station is a hydroelectric facility in Russia’s Kabardino-Balkaria region that generates electricity using the flow of the Baksan River.
  • D. Aragvi River hydroelectric system
    The Aragvi River hydroelectric system is a network of dams, reservoirs, and power stations on Georgia’s Aragvi River that generates hydroelectric power and regulates water resources for the region.
  • E. Kara-Köl Hydroelectric Power Station
    Kara-Köl Hydroelectric Power Station is a major hydroelectric facility in Kyrgyzstan that harnesses the Naryn River to generate electricity for the region and the national grid.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Vorotan hydropower cascade
Target entity description: Vorotan hydropower cascade is a major hydroelectric power generation complex in Armenia that harnesses the flow of the Vorotan River through a series of dams and power stations.
  • A. Tash-Kumyr Hydroelectric Power Plant
    Tash-Kumyr Hydroelectric Power Plant is a hydroelectric facility in Kyrgyzstan that generates electricity from the Naryn River as part of a cascade of dams and power stations.
  • B. Sevan HPP dam
    The Sevan HPP dam is a hydroelectric power plant structure in Armenia that regulates outflow from Lake Sevan along the Hrazdan River to generate electricity and manage water resources.
  • C. Baksan Hydroelectric Power Station
    The Baksan Hydroelectric Power Station is a hydroelectric facility in Russia’s Kabardino-Balkaria region that generates electricity using the flow of the Baksan River.
  • D. Aragvi River hydroelectric system
    The Aragvi River hydroelectric system is a network of dams, reservoirs, and power stations on Georgia’s Aragvi River that generates hydroelectric power and regulates water resources for the region.
  • E. Kara-Köl Hydroelectric Power Station
    Kara-Köl Hydroelectric Power Station is a major hydroelectric facility in Kyrgyzstan that harnesses the Naryn River to generate electricity for the region and the national grid.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69da6274c58c81909c646eabed6f4f30 completed April 11, 2026, 3:02 p.m.
NER Named-entity recognition batch_69e6716b4c148190bf663b8a747fbfa5 completed April 20, 2026, 6:33 p.m.
Created at: April 11, 2026, 11:40 p.m.