Triple

T20234849
Position Surface form Disambiguated ID Type / Status
Subject PTH 101 E495622 entity
Predicate connectsWith P37 FINISHED
Object PTH 75 NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: PTH 75 | Statement: [PTH 101, connectsWith, PTH 75]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: PTH 75
Context triple: [PTH 101, connectsWith, PTH 75]
  • A. PTH 75 chosen
    PTH 75 is a major Manitoba provincial highway that serves as the primary route between Winnipeg and the U.S. border at Emerson.
  • B. PTH 7
    PTH 7 is a provincial highway in Manitoba, Canada, that serves as a key north–south route linking Winnipeg to communities to its north.
  • C. PTH 100
    PTH 100 is a major ring road route forming part of the Perimeter Highway system around Winnipeg, Manitoba.
  • D. PTH 1
    PTH 1 is a major provincial highway in Manitoba, Canada, forming part of the Trans-Canada Highway and serving as a primary east–west transportation route across the province.
  • E. PTH 15
    PTH 15 is a provincial highway in Manitoba, Canada, serving as an important east–west route linking Winnipeg to communities to the east.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69da626cff80819097b530718a7c98b6 completed April 11, 2026, 3:02 p.m.
NER Named-entity recognition batch_69e6716995b88190a8514b41232b0e94 completed April 20, 2026, 6:33 p.m.
Created at: April 11, 2026, 11:40 p.m.