Triple
T20229392
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Energodar |
E495474
|
entity |
| Predicate | hasFacility |
P105
|
FINISHED |
| Object | Zaporizhzhia Thermal Power Plant |
—
|
NE NERFINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Zaporizhzhia Thermal Power Plant | Statement: [Energodar, hasFacility, Zaporizhzhia Thermal Power Plant]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Zaporizhzhia Thermal Power Plant Context triple: [Energodar, hasFacility, Zaporizhzhia Thermal Power Plant]
-
A.
Zaporizhzhia Nuclear Power Plant
The Zaporizhzhia Nuclear Power Plant is the largest nuclear power station in Europe, located in southeastern Ukraine and a focal point of safety concerns during the Russian invasion of Ukraine.
-
B.
Khmelnitsky Nuclear Power Plant
Khmelnitsky Nuclear Power Plant is a major Ukrainian nuclear power station located in the Khmelnytskyi region, contributing significantly to the country’s electricity generation.
-
C.
Rivne Nuclear Power Plant
Rivne Nuclear Power Plant is a major Ukrainian nuclear power station that generates electricity for the national grid and is located in the country’s northwestern Rivne region.
-
D.
South Ukraine Nuclear Power Plant
The South Ukraine Nuclear Power Plant is a major nuclear power-generating facility in southern Ukraine that plays a key role in the country’s electricity supply and energy infrastructure.
-
E.
Kremenchuk Hydroelectric Power Plant
The Kremenchuk Hydroelectric Power Plant is a major hydroelectric facility on the Dnieper River in central Ukraine, contributing significantly to the country’s power generation and water management system.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Zaporizhzhia Thermal Power Plant Target entity description: Zaporizhzhia Thermal Power Plant is a major coal-fired power station in southeastern Ukraine that plays a significant role in the country’s electricity generation.
-
A.
Zaporizhzhia Nuclear Power Plant
The Zaporizhzhia Nuclear Power Plant is the largest nuclear power station in Europe, located in southeastern Ukraine and a focal point of safety concerns during the Russian invasion of Ukraine.
-
B.
Khmelnitsky Nuclear Power Plant
Khmelnitsky Nuclear Power Plant is a major Ukrainian nuclear power station located in the Khmelnytskyi region, contributing significantly to the country’s electricity generation.
-
C.
Rivne Nuclear Power Plant
Rivne Nuclear Power Plant is a major Ukrainian nuclear power station that generates electricity for the national grid and is located in the country’s northwestern Rivne region.
-
D.
South Ukraine Nuclear Power Plant
The South Ukraine Nuclear Power Plant is a major nuclear power-generating facility in southern Ukraine that plays a key role in the country’s electricity supply and energy infrastructure.
-
E.
Kremenchuk Hydroelectric Power Plant
The Kremenchuk Hydroelectric Power Plant is a major hydroelectric facility on the Dnieper River in central Ukraine, contributing significantly to the country’s power generation and water management system.
- F. None of above. chosen
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69da626cff80819097b530718a7c98b6 |
completed | April 11, 2026, 3:02 p.m. |
| NER | Named-entity recognition | batch_69e66fdc2590819089a946d16c6c0e59 |
completed | April 20, 2026, 6:26 p.m. |
Created at: April 11, 2026, 11:39 p.m.